Laserfiche WebLink
<br />GivingNotice <br />. <br /> <br />Guarantee of Nork-by Cantractor <br />13.1 <br />lndemnifica[ion <br />630-632 <br />Inspection, Finat <br />14.11 <br />Inspection, Tests and <br />133 <br />Insurance, Bonds and-in general <br />S <br />Insurance. Certificates of <br />2.7, 5 <br />Insurance--completed operations <br />5.3 <br />Insurance, Contractor's Liability <br />53 <br />Insurance, Contactual Liability <br />5.4 <br />Insurance, Owner's Liability <br />5.5 <br /> <br />Insurance, Property <br />5.6-5.13 <br />Insurance-Waiver of Rights <br />5.11 <br />Intent of Contract Documents <br />33, 9.14 <br />Incerpretations and Ctazifications <br />9.4 <br />Investigations of physical conditions <br />4.2 <br />L.abor, Materials and Equipment 63-6.5 <br />Laws and Regutations--definition of 1 <br />Laws and Rcgulations-general 6.14 <br />Liability Insurance-Contractor's 53 <br />Liability Insurance-Owner's 5.5 <br />Liens--definitions of 14.2 <br />Limitations on Engineer's <br />Responsibilities 6.6, 9 I1, 9.13-9.16 <br />Materia(5 and equipmznt-furnished by Cont tor 63 <br />Materials and equipmznt-no[ <br />incorpo[ated in Work 14.2 <br />' Materials or equipment-equivalent 6.7 <br />' Miscellaneous Provisions 17 <br />Mul[i-prime contracis 7 <br />Notice, Giving of 17.1 <br />Notice of Acceptability of Project 14.13 <br />Notice of Award-definition of l <br />Notice to Proceed-defini[ion of 1 <br />No[ice to Proceed-Siving of 23 <br />..Or-Equal" Items <br />6.7 <br /> <br />Otha contractors <br />. <br />~ <br />7 <br />Other work <br /> <br />Overtime Work-prohibition of <br />63 <br />Owner-definition of <br />I <br />Owner May Correct Dejective Work <br />13.14 <br />Owner May Stop Work <br />13.10 <br />. <br />Owner May Suspend Work, Terminate . <br />15.1-15.4 <br />. <br />Owner's Duty to Execute Change Orders <br />11.8 <br />Owner s Liabili[y Insurance <br />5.5 <br />Owner's Representative-Engineer to serve a <br />9.1 <br />Owner's Responsibilities-in general <br />8 <br />Owner's Separate Representative at site <br />93 <br />Partial Utiliution 14.10 <br />Partial Utiliution-definition of t <br />Partial Utilization-Property Insurance 5.15 <br />I' 1 Patent Fees and Royalties 6.12 <br />Payments, Recommenda[ion of 14.4-I4.7, I4.13 <br />Payments to Contractor-in general 14 <br />Payments [o Contractor-when due 14.4, 14.13 <br />Payments [o Contractor-withholding <br />14.1 <br />Performance and o[her Bonds <br />. 5.1-5.2 <br />Permics <br />6.13 <br />Physical Conditions <br />4.2 <br />Physical Conditions-Engineer's review <br />4.2.4 <br />Physical Conditions-existing structures <br />4.2.2 <br />Physical Condi[ions--explorations and reports <br />4.2.1 <br />Physical Conditions-possible document change <br />4:2.5 <br />Physical Conditions-price and time adjus[ments . <br />4.2.5 <br />Physical Conditions-report of differing <br />4.23 <br />Physical Conditions-Underground Facilities <br />4.3 <br />Preconstruction Canference <br />2.8 <br />Preliminary Ma[ters <br />2 <br />Premises, Use of <br />6.16-6.18 <br />Price, Change of Contract <br />II <br />Price-Contract-definition of <br />I <br />Progress Payment, Applications for <br />14.2 <br />Progress Payment-retainage <br />14.2 <br />Progress schedule 2.6, 2.9, 6.6, 6.29, 15.2.6 <br />Project-definition of <br />1 <br />Project Representa[ion-provision for <br />9.3 <br />Project Represen[ative, Resident-de6nition of <br />I <br />Project, Starting the <br />2.4 <br /> <br />Propeny Insurance <br />. 5:6-5.13 <br />Property Insurance-Partial Utilization <br />5.15 <br />Property Insurance-Receipt and Application <br />of Proceeds <br />5.12-5.13 <br />Protection. Safety and <br />6.20-6.21 <br />Punch list <br />14.11 <br />Recommendation of Payment <br />I4:4; -14.13 <br />Record Documents <br />6.19 <br />Reference Points <br />4.4 <br />Regulations. Laws and <br />6.14 <br />Rejecting Defective Work <br />9.6 <br />Related Work at Site <br />7.1-73 <br />Remedies Not Exciusive <br />17.4 <br />Removal or Correction of Dejecrive Work . <br />13.11 <br />Resident Projec[ Representative-definition <br />of I <br />Resident Project Represen[a[ive-provision <br />for 93 <br />Responsibilities, Contmctor's-in general . <br />6 <br />Responsibilities, Engineer's-in general <br />9 <br />Responsibilities, Owner's-in generel <br />8 <br />Retainage <br />14.2 <br />Reuse of Documents <br />3.5 <br />y <br />Rights of Wa <br /> <br />4'~ <br />Royalties, Patent Fees and <br />6.I2 <br /> <br />6.20-6.21 <br />Safety and Protection <br />Samples <br />.23-6.28 <br />6 <br /> <br />Schedule of progress <br />2.6, 2.8-2.9, 6.6, 6.29, 15.2.6 <br />Schedule ofShop DrawinB <br />submissions <br />2.6, 2.8-2.9. 613. 14.1 <br />Schedule of values <br />2.6, 2.8-2.9, 14.1 <br />Schedules. Finalizing <br />2.9 <br />Shop Drawings and Samples . <br />6.23-6.28 <br />Shop Dcawings-definition of <br /> <br />Shop Drawings,use[o approve <br />6.73 <br />substitutions <br /> <br />35 <br />