My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-J Cox Field Water Main
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
12 - December
>
2001-12-10
>
06-J Cox Field Water Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:03:47 AM
Creation date
12/4/2001 10:38:47 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-J
AGENDA - Type
RESOLUTION
Description
Award bid for replacement of 8" water main at Cox Field Airport
AGENDA - Date
12/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br />conditions and drawings of physical conditions which are identified in the Supplementary Conditions <br />as provided in paragraph 4.2 of the General Conditions, and accepts the determination set forth in <br />paragraph SC-4.2 of the Supplementary Conditions of the extent of the technical data contained in <br />such reports and drawings upon which CONTRACTOR is entitled to reply. <br />7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining <br />and carefully studying) all such examinations, investigations, explorations, tests, reports and studies <br />(in additions to or to supplement those referred to in paragraph 7.2 above) which pertain to the <br />subsurface or physical conditions at or contiguous to the site or otherwise may affect the cost, <br />progress, performance or furnishing of the Work at the Contract Price, within the Contract Time and <br />in accordance with the other terms and conditions of the Contract Documents, including specifically <br />the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, <br />investigations, explorations, tests, reports, studies or similar information or data are or will be <br />required by CONTRACTOR for such purposes. <br />7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on <br />the Contract Documents with respect to existing Underground Facilities at or contiguous to the site <br />and assumes responsibility for the accurate location of said Underground Facilities. No additional <br />examinations, investigations, explorations tests, reports, studies or similar information or data in <br />respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform <br />and furnish the Work at the Contract Price, within the Contract Time and in accordance with the <br />other terms and conditions of Contract Documents, including specifically the provisions of paragraph <br />4.3 of the General Conditions. <br />7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br />investigations, explorations, tests, reports and studies with the terms and conditions of the Contract <br />Documents. <br />7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies <br />that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER <br />is acceptable to CONTRACTOR. <br />Article 8. CONTRACT DOCUMENTS. <br />The Contract Documents which comprise the entire agreement between OWNER and <br />CONTRACTOR concerning the Work consist of the following: <br />8.1 This Agreement (pages 17 to 22, inclusive). <br />8.2 Exhibits to this Agreement (pages to , inclusive.) <br />8.3 Performance and other Bonds, identified as exhibits <br />pages. <br />8.4 Notice of Award. <br />8.5 General Conditions (pages 33 to 62 inclusive). <br />and consisting of <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.