My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-J Cox Field Water Main
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
12 - December
>
2001-12-10
>
06-J Cox Field Water Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:03:47 AM
Creation date
12/4/2001 10:38:47 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-J
AGENDA - Type
RESOLUTION
Description
Award bid for replacement of 8" water main at Cox Field Airport
AGENDA - Date
12/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
such use or occupancy shall commencc bc(orc the insurcrs <br />providing the propeny insurance have acknowledg d notice <br />thcreofandinwritinge(fectedthechangesincovera encces- <br />sitated thereby. The insurers providing the prope ty insur- <br />ance shall consent by endorsement on the policy o policies, <br />but the property insucance shall not be cancelled o lapse on <br />account of any such panial use or occupancy. <br />ARTICLE Cr-CONTRACTOR'S <br />Supervisiors arsd Superirt[ertdence: <br />6.1. CONTRACTOR shafl supervise and direc <br />competendy and efficiently, devoting such atcenti <br />and applying such skills and expertise as may be <br />to pedorm the Work in accordancc with the Cor <br />umonts. CONTRACfOR shall be solely responsi <br />means, methods, techniques, sequences and pra <br />con:truction, but CONTRACTOR shall not be c <br />for the negligence of othea in the design or sel <br />specific means, method,technique, sequence or <br />of eonstruction which is indicated in and requi <br />Contract Documents. rCONTRAGTOR shall be 1 <br />to see that the finished Work complies accurate <br />Contract Documents. <br />6.2. CONTRAC'COR shall keep on the Work <br />during its progress a compe[ent resident superinte <br />shall not be replaced without written notice to O <br />ENGINEER excepc under extraordinary circums <br />. <br />superintendent will be CONTRACfOR's repre <br />the site and shalt have authority to act on behs <br />TRACTOR. All communications given to the suF <br />shall be as binding u if given to CON"CRACTOE <br />Labor, Materials and Equipmertl: <br />* 63. CONTRAC'fOR shall provide compet <br />qualified personnel [a survey and lay out the W <br />form eonstruction as required by the Contract <br />CONTRAC'fOR shall at all times maintain go <br />and order at the site. Exccpt in connection with <br />protection of persons ar the Work or property <br />adjacent thereto, and except as othenvise ind <br />Contract Documents, atl Work at the site shall I <br />during regular working houcs, and CONTRAC <br />permit overtime wark or the pecformance of I <br />urday, Sunday or any legal holiday without OP <br />ten consrnt given after prior writcen notice to E <br />6.4. Un(ess otherwise specified in the Gene <br />ments, CONTRACTOR shall tumish and assumt <br />sibility for all materials, equipment, (aboq tra <br />construction equipment and machinery, toois, <br />Cuel, power, light, heat, [elephone, wateq saniu <br />temporary facitities and afl other facilities ane <br />necessacy for the furnishing, performance, tast <br />and eompletion of the Work. <br />ie Work <br />[hemto <br />:cessary <br />ict Doc- <br />; for the <br />dures of <br />ponsible <br />ion of a <br />rocedure <br />i by the <br />ponsible <br />with the <br />all times <br />lent, who <br />NER and <br />ues. The <br />uative at <br />of CON- <br />suitably <br />and per- <br />discipline <br />e safety or <br />the site ar <br />ited in the <br />performed <br />)R witl not <br />irk on Sat- <br />ER's wrib <br />Require- <br />Irespon- <br />y Cacilities, <br />inciden[als <br />~g, start-up <br />6.5. All matcrials and equipment shal6be oC good quality <br />and ncw, escept as othcnvise provided in the Convact Doc- <br />uments. IC required by ENGINEER, CONTRAC'CDR shall <br />Curnish satis(actory evidence (including reports oC required <br />tests) as to the kind and quality of materials and equipment. <br />AII materials and equipment shall 6e applied, instatled, con- <br />nected, erected, used, cleaned and conditioned in accordance <br />with the instructions of the applicable Supplier except as <br />otherwise provided in the Contract Documents; but no pro- <br />vision of any such instruc[ions will be effective to assign to <br />ENGIN EER, or any of ENGINEER's consultants, agents or <br />employees, any duty or authoriry [o supervise or direct the <br />fumishing or performance of the Work or any duty or author- <br />ity [o undertake responsibility contrary to the provisions of <br />paragraph 9.15 or 9.16. <br />Adjusling Progress Schedu[e: <br />6.6. CONTRACTOR shall submit to ENGINEER far <br />acceptance (to the exten[ indicated in paraSraph 2.9) adjust- <br />ments in the progress schedule to reflect the impact thereon <br />of new devclopments; these will conform generally to the <br />progress schedule then in effect and additionafly will comply <br />wi[h any provisions of the General Requirements applicable <br />thereto. <br />Subs6tules or "Or-Equa1" Itemr: <br />6.7.1. Whenever materials or equipment are specified <br />or described irt the Contrac[ Documents by using the name <br />of a proprietary item or the name of a paRicular Suppiier <br />the naming of the item is in[ended to es[ablish the type, <br />function and quality required. Unless the name is followed <br />by words indicating that no substitution is permitted, <br />materials or equipment of other Suppliers may be accepted <br />by ENGINEER if sufficien[ information is submitfed by <br />CONTRACTOR to allow ENGINEER to determine that <br />the material or equipmen[ proposed is equivalent or equal <br />to that named. The procedure for review by ENGINEER <br />wil( include the following as supplemented irt the General <br />Requirements. Requests for review af substitute items of <br />material and equipment will no[ be accepted by ENGI- <br />NEER Crom anyone other than CONTRACTOR. If CON- <br />TRACTOR wishes to furnish or use a substitute item of <br />material or equipment, CONTRAC'I'OR shall make writ- <br />ten appliwtion to ENGINEER for acceptance thereof, <br />certifying that the proposed substitute will perform ade- <br />quately the functions and achieve the results called for by <br />the generel design, be similar and of equal substance to <br />that specified and be suited to the same use as that spec- <br />ified. The appliwtion will state that the evalua[ion and <br />accep[ance of the proposed substitute will no[ pryudice <br />CONTRACT'OR's achievement of Substantial Comple- <br />tion on time, whether or not acceptance of the substitute <br />far use in the Work witl require a change in any of the <br />Contract Documents (or in the provisions of any o[her <br />direct contract with OWNER Cor work on the Project) to <br />adapt the design to the proposed substimte and whether <br />ar not incorporation or use of the substitute in connection <br />with the Work is subject to payment of any license Cee or <br />*See Supplementary Conditions I - <br />g4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.