My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-J Cox Field Water Main
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
12 - December
>
2001-12-10
>
06-J Cox Field Water Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:03:47 AM
Creation date
12/4/2001 10:38:47 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-J
AGENDA - Type
RESOLUTION
Description
Award bid for replacement of 8" water main at Cox Field Airport
AGENDA - Date
12/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pletion oC the WurA, thcsc rzcord documtnts. x. mples und <br />t ShopDn«ingswillbadclivaredtoENGINGEKfo,OWNER. <br />i <br />Safery and Protection: <br />*6.20. CONTRACTOR shall be responsible f r initiatinS. <br />maintainine and supervisine all safety precautio s and pro- <br />grams in conncction with the Work. CONTRA OR shall <br />take all necessary przcautions Cor thz safe[y o, and shail <br />provide the necessary protec[ion [o prevent da age, injury <br />or loss to: <br />6.20.1. all employees on the Work and ot er persons <br />and organizations who may be affected there y; <br />6.20.2. all the Work and materials and e uipment to <br />be incorporated therein, whether in storage n or oll the <br />site; and <br />6.203. oeher propeny ac the site or adja ent thereto, <br />including trees, shrubs, lawns, walks, pave ents, road- <br />ways, structures, utilities and Underground acilities not <br />designaced for removat, relocation or replac ment in the <br />course of construction. - <br />CONTRACTOR shall comply With all applicat <br />Regula[ions of any public body having jurisdi <br />safety of persons or propeny or [o pro[ect them f <br />injury or loss; and shalt orect and maintain ; <br />~ safeguards for such safety and pro[ection. CO <br />shall notify owners of adjacent property and of <br />Facilities and u[ility owners when prosecution <br />may affect them, and shall cooperate with the <br />tection, removal, relocation and replacement i <br />etty. All damage, injury or loss co any proper <br />in paragaph 6.20:2 or 6.20.3 caused. directly <br />in whote or in part, by CONTRACTOR, any S' <br />Supplieror any othzr person or organization di <br />rectly employed by any of them to perform or 1 <br />the Work or anyone for whose acts any of them <br />shall be remedied by CONTRACTOR (except d <br />attributable to the Cault of Drawings or Specil <br />the acts or omissions of OWNER or ENGINE <br />employed by either oC them or anyone for wh( <br />of them may be liable, and not atiributable, di <br />rccdy, in whok or in paa, to the faul[ or negiig <br />TRACTOR). CONTRACCOR's duties and r <br />for the safety and protection oC the Work shall <br />such time as all the Work is compteted and ET <br />issued a notice to OWNER and CONTRAC'f <br />ance with paragaph 14.13 that the Work is acce <br />as otherwise expressly provided in connection <br />tial Compktion). <br />6.21. CONTRACTOR shall designate a re <br />resentative at the site whasc duty shall be thc <br />~ accidents. This person shali be CONTRACf <br />tendent unless otherwise desi6nated in wri <br />TRACCOR to OWNER. <br />*See Supplementary Conditions <br />Laws and <br />on far the <br />necessary <br />F the Work <br />in the pro- <br />their prop- <br />referred to <br />indirectly. <br />tly or indi- <br />iish any of <br />y be liable, <br />ageorloss <br />tians or to <br />oranyone <br />ac[s either <br />tfy or indi- <br />;e af CON- <br />ntinue until <br />INEER has <br />t in accord- <br />able (except <br />ith Substan- <br />ErrrerFcrrcies: <br />6.22. In emereencies af(ecting the safetYor protcuion of <br />Fxrsuns or thc Wurk or propcny nt thc sitc or aljatent thereto. <br />CON1'RACTOR, without special instruction or authorization <br />from ENGINEGR orOWNER, is obligaeed to act to prevent <br />threatencd damagc. injury or loss. CONTRACTOR shall give <br />ENG IN EER prompt written notice if CONTRAC'COR bclicves <br />[hat any significant changes in the \Vork or variations from <br />the Con[ract Documents have been caused thereby. I(ENGI- <br />NEER determines thae a change in the Contract Documents <br />is required because of Ihe action taken in response to an <br />emergency. a Work Directive Change or Change Order will <br />be issued to document the consequences of the changes or <br />variations. <br />Shop Drawings and Samples: <br />6.23. After checking and verifying all field measurements <br />and after complying wich applicable procedures specified in <br />the General Requircments. CONTRAC'f0R shall submit to <br />ENGINEER for review and approval in accordance with the <br />accepted schedule of Shop Drawing submissions (see para- <br />graph 2.9), or Cor other appropriate action if so indicated in <br />the Supplemen[ary Conditions, five copies (unless othenwise <br />specified in the General Requirements) of all Shop Drawings. <br />which will bear a stamp or specific written indication that <br />CONTRACTOR has satisfied CONTRACTOR's responsi- <br />bilities under the Cont2ce Documen[s with respect to the <br />review of the submission. Ali submissions will be identified <br />as fiNGiNEER may require. The data shown on the Shop <br />Drawings will be complefe with respect to quantities, dimen- <br />sions, specified performance and design criceria,•ma[erials <br />and similar data to enable ENGINEER ro review the infor- <br />mation as required. <br />6.24. CONTRACCOR shall also submit to ENGINEER <br />for review and approval with such promptness as to cause <br />no delay in Work, atl samples required by the Contract Doc- <br />uments. All samples wilt have been checked by and accom- <br />panied by a specific written indication that CONTRAC'fOR <br />has satisfied CONTRACCOR's responsibilities under the <br />Contract Documents wi[h respect to the review of the sub- <br />mission and will be identified clearly as to material. Supplier, <br />pertinent data such as cataloS numbers and the use for which <br />intended. <br />6.25.1. Before submission of each Shop Drawing or <br />sample CONTRAC"COR shail have determined and veri- <br />fied all quantities, dimensions, specified pecformance cri- <br />teria, installation requirements, materials, catalo6 num- <br />bers and similar data with respect thereto and reviewed <br />or coordinated each Shop Drawing or sample with other <br />Shop Drawings and samples and with the requirements of <br />the Work and Ihe Contract Documents. <br />sponsible rep- 'b.25.2. At the [ime of each submission, CONTRAC- <br />preventionof TORshallgivcENGINEERspccificwrittennoticeofeach <br />OR's superin- variation that the Shop Drawfngs or samples may have <br />in6 by CON- In add u ne shail cause arspcc fic notatio~n o be made on <br />4,7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.