My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-J Cox Field Water Main
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
12 - December
>
2001-12-10
>
06-J Cox Field Water Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:03:47 AM
Creation date
12/4/2001 10:38:47 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-J
AGENDA - Type
RESOLUTION
Description
Award bid for replacement of 8" water main at Cox Field Airport
AGENDA - Date
12/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
effeccive to as:ign to ENGINEER any duty or aui <br />~ superviseordirec[the(urnishingorperformanceof <br />or any duty or authonty to undertake responsibiliry <br />to the provisions of paraeraph 9.15 or 9.16. <br />9.15. ENGINEER will not be responsibic f <br />TRACTOR's means, methods, techniques, sequenc <br />cedures of conswction, or the sa(ety prccau[ions <br />grams incident thereto, and ENGINEER will not b <br />sible for CONTRACTOR's failure to pedorm'or fc <br />1Vork in accordance with the Contract Documents. <br />9.16. ENGINEER will not be responsible for <br />omissions of CONI'RACTOR or of any Subcont <br />Supplier, or of any other person or organization <br />or furnishing any of the Work. <br />ARTICLE IO--CHANGES IN THE WORK <br />10.1. Withoutinvalid9eingtheAgreementandwith< <br />to any surcty, ONNER may, at any time or froR <br />time, order additions, deletions or revisions in [h <br />these will be auchorized by a Written Amendment, a <br />Ordeq or a Wark Directive Change. Upon receipt oE <br />document, CONTRAC'f0R shall promptfy proceed <br />Work involved which will be performed under the al <br />conditions af the Con[ract Documents (except as o <br />specificaily provided). <br />101. If OWNER and CONTRACI'OR are unabl <br />as to the extrnt, if any, of an increase or decres <br />Contract Price or an extension or shortening of the <br />Time that should be aftowed as a result of a Work <br />Change, a elaim may be made therefor as provided <br />I! orArticle 12. <br />I03. CONTRACTOR shall not be entided to an <br />in the Contract Price or an extension of the Contr <br />with respect to any Work pedormed [hat is not req <br />the Contract Documents as amended, modified anc <br />mented as provided in paragraphs 3.4 and 3.5, exce <br />case of an emergency as providad in paragraph i <br />except in the case of uncovering Work as provided <br />graph 13.9. <br />10.4. OWNER and CONTRACTOR shall ex <br />priate Change Orders (or Wrie[en Amendments) <br />10.4.1. ehanges in the Work which are orc <br />OWNERpursuanttoparagraph IO.I,arerequired <br />of acceptance of dejectire Work under paragraph <br />eorreeting dejecrive Work under paragraph 13.1. <br />agreed to by the parties; <br />10.4.2. changesintheContractPrice <br />which are agreed to by the partics; and <br />oriry to 10.43. changa in the Contract Price or ConiractTime <br />ie Work which embody the substanca oC any writtcn decision ren- <br />.ontnry dcred by ENGINEER pursuant to paragraph 9.11; <br />provided that, in lieu of eaecuting any such Change Order, <br />an appeal may be taken Crom nny such decision in actordance <br />CON- withtheprovisionsoftheContractDocumentsandapplicabic <br />~orpro- Laws and Regulations, but during any such appeal. CON- <br />nd pro- TRACTOR shall carry on the 1Vork and adhcre to the prog- <br />respon- ress schedule as provided in paracraph 6.29. <br />iish the <br />10.5. [f notice of any change affecting the general seope <br />of the Work or the provisions of the Contract Documents <br />acts or (inetuding, bu[ not limited w, Contract Price or Contrac[ <br />or, any Time) is required by the provisions of any Bond to be given <br />brming to a surety, the giving of any such notice will be CONTRAC- <br />TOR's responsibility, and the amount of each applicable Bond <br />will be adjusted accordingly. <br />- ARTICLE 1I-CHANGE OF CONTRACT PR[CE <br />time [o 11•1• The Contract Price constitutes the total compen- <br />Work; sation (subject to authorized adjustments) payable to CON- <br />Change TRACTOR for perForming the Work. All duties, responsibil- <br />nysuch ities and obligations assigned to or undenaken by CON- <br />Nith the TRACTOR shall be at his expense without changa in the <br />..r....,~~e Contract Price. <br />11.2. The Contrac[ Price mav onfy be changed by a Change <br />Orderor by a Written Amendmenl. Any claim foran inerease <br />o agree or decrease in the Contract Price shall be based on written <br />in the notice delivered by the party making the claim to the other <br />ontract PartyandtoENGINEERprompdy(butinnoeventlaterthan <br />rective thirty days) after the occurrence of the event giving rise to <br />Article the ciaim and stating the general nature oC the claim. Notice <br />of the amount of the claim with supponing data shall be <br />delivered within sixty days after such occurrence (unless <br />ENGINEER allows an additional period of time to ascertain <br />icrease more accurate data in suppon oC the ciaim) and shall be <br />tTime accompaniedbyclaiman['swrittenstatementtha[theamount <br />ired by claimed covers all known amounts (direc[, indirect and con- <br />'uPPlO- sequential) to which the claimant is entitled as a result of the <br />t in the occurrence of said event. All claims for adjustment in the <br />22 and Con[ract Price shall be determined by ENGINEER in accor- <br />" Para' dance with paragraph 9.11 if OWNER and CONTRACI'OR <br />cannot othenvise agree on the amount invoived. No ciaim <br />for an adjustment in the Contract Price will be valid if not <br />appro- submitted in accordance with Ihis paragraph 11.2. <br />11.3. The value of any Work covered by a Change Order <br />-ed by or of any elaim (or an increase or decrease in the Contract <br />:cause price shall be determined in one of the following ways: <br />S.I3 or <br />or are I13.1. Where the Work involved is covered by unit <br />prices contained in the Contract Documents, by applica- <br />tion of unit prices to the quantities oC the items involved <br />ITima (subject to the provisions oC paragraphs 1I.9.1. through <br />11.93, inclusive). <br />51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.