Laserfiche WebLink
SC 1 DEFINED TERMS <br />The terms used in th <br />defined in the Stand <br />Contract have the me <br />Conditions. <br />SC 2.3 <br />Amend the last sen <br />Conditions to read <br />Supplementary Conditions which are <br />General Conditions of the Construction <br />ngs assigned to them in the General <br />e of paragraph 2.3 of the General <br />follows: <br />"In no event will th Contract Time commence to run later than <br />the eighty-fifth (85 h) day after the day of Bid opening or the <br />thirtieth day (30th) after the Effective Date of the Agreement, <br />whichever date is ea lier." <br />and as so amended pa~agraph 2..3 remains in effect. <br />SC 3.2. <br />Add the following 1 nguage at the end of paragraph 3.2 of the <br />General Conditions: <br />"Should there be an <br />Contract Documents <br />standard specificat <br />will take precedenc <br />SC 4.2.1 <br />Add the following 1 <br />General Conditions: <br />conflict between the provisions of the <br />d any such referenced provisions of any <br />n, manual or code, the Contract Documents <br />auage at the end of paragraph 4.2.1 of the <br />"No subsurface repo ts of exploration and tests of subsurface <br />conditions at the s'te have been utilized by the ENGINEER in <br />preparation of the ontract Documents." <br />SC 5.1 <br />Add the following language at the end of paragraph 5.1 of the <br />General Conditions: . <br />"The form for Cons ruction Performance Bond and Construction <br />Payment Bond are s t forth herein." <br />SC 5.3 <br />The limits of liab lity for the insurance required by paragraph <br />5.3 of the General Conditions shall provide coverage for not less <br />than the following amounts or greater where required by Laws and <br />Regulations: <br />(05 <br />