My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-VARIANCE REQUEST FOR CONSTRUCTION OF CURB AND GUTTER AND FINAL PLAT FOR T&K MACHINE
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
11 November
>
11.12.12
>
08-VARIANCE REQUEST FOR CONSTRUCTION OF CURB AND GUTTER AND FINAL PLAT FOR T&K MACHINE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2012 3:00:24 PM
Creation date
11/9/2012 3:00:24 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />TO: Mayor and City Council <br />Planning and Zonin Commission <br />FROM: Shawn Napier, P.E. <br />Director of Engine g, Planning & Development <br />DATE: November 2, 2012 <br />SUBJECT: T&K Machine 355 Addition Final Plat <br />I have reviewed the final plat of the above referenced addition. It appears that the final plat <br />complies with the City of Paris subdivision re�ulations with the following exceptions. <br />1. Provide the minimum finished floor elevations. <br />2. Show the centerline of the existing 30-foot wide asphalt road. <br />3. Add a 10-foot wide utility easement far the existing power line on the west side of the <br />building. <br />4. Show the existing 50-foot wide easement for the existing gas main on the east side of the <br />main building. <br />I recommend approval of the final plat upon submission of a corrected mylar copy with <br />signatures of the surveyor and owner prior to noon on November 9, 2012. <br />cc: John Godwin, City Manager <br />Jim Nelson, R.P.L.S., Nelson Surveying Co. <br />Cory Campbell <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.