Laserfiche WebLink
OWNER contemplates hiring twenty-two (22) new personnel as full-time employees of <br />OWNER to work at OWNER'S facility in Paris, Texas. The additional building of 5,000 square <br />feet and the 8 new machining centers which are the subject of this Abatement Agreement shall <br />be called the "IMPROVEMENTS". <br />III. <br />Improvements <br />3.1 The construction and installation of the IMPROVEMENTS will require <br />engineering and design work, procurement of equipment, infrastructure and utilities <br />modifications and electrical and mechanical installations on the Land. The IMPROVEMENTS <br />are being made to enable the OWNER to increase its capability to manufacture precision <br />machined parts for the aerospace industry. The IMPROVEMENTS are more specifically <br />described as follows, and are to be located as is shown in Exhibit C attached hereto: <br />A. To the Land, building modifications to add 5,000 new square feet of building <br />space to house the new machining centers and employees. <br />B. New machining centers to be placed within the new building described as follows: <br />1) YCM NSV-156A 3 axis CNC machining center — Cost: $175,000.00. <br />2) YCM NSV-156A 3 axis CNC machining center— Cost: $175,000.00. <br />3) YCM NSV-156A 3 axis CNC machining center— Cost: $175,000.00. <br />4) YCM NSV-156A 3 axis CNC machining center— Cost: $175,000.00. <br />5) YCM NSV-156A 3 axis CNC machining center— Cost: $175,000.00. <br />6) YCM NSV-156A 3 axis CNC machining center— Cost: $175,000.00. <br />7) YCM NTV-156A 3 axis CNC machining center — Cost: $175,000.00. <br />8) YCM NTV-156A 3 axis CNC machining center — Cost: $175,000.00. <br />The IMPROVEMENTS will be described in the CITY'S Certificate of Completion prepared <br />after the completion and installation of the above described building modifications and <br />improvements, personal property, machinery and equipment. The description shall be furnished <br />to and filed with the Chief Appraiser of the Lamar County Appraisal District. Said Certificate <br />shall be duly executed by the Mayor of the City of Paris in the form attached hereto as Exhibit <br />D. The IMPROVEMENTS will be at a cost equal to or in excess of $1,560,000.00 to OWNER, <br />and shall be substantially completed over the five (5) year term as shown in the tax abatement <br />schedule attached hereto as Exhibit E, and made a part hereof for all purposes; provided, that <br />OWNER shall have such additional time to complete the IMPROVEMENTS as may be required <br />in the event of "force majeure" if OWNER is diligently and faithfully pursuing completion of the <br />installation of the IMPROVEMENTS. For this purpose, "force majeure" shall mean any <br />contingency or cause beyond the reasonable control of OWNER including, without limitation, <br />acts of God, or the public enemy, any natural disaster, war, riot, civil commotion, insurrection, <br />governmental or de facto governmental action, unless caused by acts or omissions of OWNER, <br />fires, explosions, accidents, floods, and labor disputes or strikes. The date of completion of the <br />3 <br />�- 41 <br />