My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-094 RES AUTHORIZING/APPROVING AGREEMENT BY AND AMONG COP, NEXTERA ENERGY AND DAISY FARMS
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2012
>
2012-094 RES AUTHORIZING/APPROVING AGREEMENT BY AND AMONG COP, NEXTERA ENERGY AND DAISY FARMS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2012 2:52:26 PM
Creation date
12/26/2012 2:52:25 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXCESS RAW WATER SUPPLY AGREEMENT <br />THE STATE OF TEXAS § <br />COUNTY OF LAMAR § <br />THIS EXCESS RAW WATER SUPPLY AGREEMENT (this "Agreement") is made and <br />entered into by and among the City of Paris, Texas, a Home-Rule Municipal Corporation with its <br />principal office located at 135 S.E. lst Street, Paris, Lamar County, Texas 75460 (the "CITY"), <br />Daisy Farms, LLC, a Texas limited liability company with its principal office located at 12750 <br />Merit Drive, Dallas, Texas ("DAISY"), and NextEra Energy Resources, LLC, a Delaware <br />Limited Liability company with its principal office at 3205 FM 137 Paris, Texas 75460 <br />("NEXTERA"). <br />AGREEMENT <br />WHEREAS, the City of Paris is the owner of Certificate of Adjudication No. 02-4940, <br />as amended, authorizing, among other uses, the use of up to 20,000 acre-feet of water per annum <br />for industrial purposes in the Sulphur River Basin in Lamar County (the "CITY'S Water Right"); <br />and <br />WHEREAS, on September 16, 1998, the City of Paris entered into a Raw Water Supply <br />Agreement (the "Original Agreement") with Panda Paris Power, L.P. ("Panda") for a supply of <br />up to eight (8) million gallons of raw water per day pursuant to the CITY' S Water Right; and <br />WHEREAS, Panda subsequently assigned or transferred its rights in the Original <br />Agreement to Lamar Power Partners and then to NEXTERA, the current owner/operator of a <br />natural gas fired power plant located at CR 21500 and FM 137, City of Paris, Lamar County, <br />Texas (the "NEXTERA Power Plant"); and <br />WHEREAS, NEXTERA has been approached by DAISY, a commercial dairy operation <br />located at FM 2036 and SH 19/24 South, Lamar County, Texas, about contracting with the CITY <br />for NEXTERA'S excess or unused daily raw water supply from the CITY; and <br />WHEREAS, the CITY is willing to sell a supply of raw water to DAISY which is over <br />and above the actual supply taken by NEXTERA on a daily basis but which does not exceed the <br />maximum daily contracted amount of eight (8) million gallons per day; and <br />WHEREAS, DAISY and NEXTERA will be responsible for designing and installing the <br />necessary water lines, pumps, meters, valves, power supply and other improvements ("New <br />Facilities") necessary to transport and meter a supply of raw water from the NEXTERA Power <br />Plant to DAISY's facility located at FM 2036 and Highway 19/24 South Lamar County, Texas <br />(the "DAISY Facility"), subject to review and permitting by the CITY; <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.