Laserfiche WebLink
MEMORANDUM <br />To: Michael Malone, City Manager <br />From: Terry Townsend, Director of Public Worksif <br />Subject: Bid Tabulation and Recommendation <br />Date: February 6, 2002 <br />The following bids were received at a bid opening on Tuesday, February 5, 2002 at <br />3 p.m., for Fleacible Base Material (Red Rock). <br />1.) Jackie Wheeler Construction <br />Rt. 6 Box 6620 <br />Paris, Texas 75462 <br />8.25 per ton <br />2.) Martin Marietta Materials/Meridian Aggregates <br />P.O. Box 219 <br />Powderly, Texas 75473 <br />8.85 per ton <br />I am recommending the low bid of $8.25 per ton from Jackie Wheeler Construction be <br />accepted for Flexible Base Material (Red Rock). <br />These funds aze budgeted in 2001-2002. <br />TT/as <br />