Laserfiche WebLink
Change Order No. 3 for the Martin Luther King Drive <br />Paving, Drainage, Water\Sewer Improvements <br />This change order will be to reconcile the contract with the minor changes <br />that have been made during the construction process and to construct box <br />culverts where the concrete lined channel intersects Hickory Street. The <br />reason for the additional box culverts at Hickory Street is to remove a <br />bottleneck at this location. The 14 feet wide and 2 feet deep concrete <br />channel currently flows into a 36-inch pipe. The plan is to add two side-by- <br />side 5-feet X 3-feet box culverts in addition to the existing 36-inch pipe in <br />Hickory Street. The original project did not include any work to done at this <br />location. <br />~ <br />zk"ol <br />Shawn Napier, P.E. <br />City Engineer <br />