My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-H Lost Water Study
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
03 - March
>
2002-03-11
>
06-H Lost Water Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 10:32:25 AM
Creation date
3/5/2002 4:17:02 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-H
AGENDA - Type
RESOLUTION
Description
Award contract for Water Lost and Unaccounted For Study to Carter & Burgess
AGENDA - Date
3/11/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal <br />Comnrehensive Water Distribution System Audit <br />• Evaluate current meter reading and billing <br />processes for efficienry and seruice level to <br />customers. <br />k Summarize the above analysis and suggest <br />recommended actionsfor improvement in metering <br />and billing adivities. <br />Project Execution <br />Location of Work Eifort <br />The Carter & BurgessTeam will perform all of the workfor <br />this projed in the Dallas office or in the Ciry of Paris. <br />Project StafFing <br />The individuals identified an the organization chart are <br />arrent employees of Carter & Burgess and Sevem Trent <br />Pipeline Services, and they are supported by an additional <br />340 people in the Carter & Burgess Dallas office. <br />City of Paris <br />Participation <br />Carter 8 Burgess believes that having dients participate <br />uctively in projects is beneficial tothe dient. One of the best <br />ways to have dients participate is to conduct periodic <br />workshops on specific topics. For this particular projed, <br />threeorfourworkshopsmnbeconducted. Eachworkshop <br />would bethree to five hourz in length and could be conduded <br />ineitherPorisorDallas. Possibleworkshaptopicsinclude: <br />* Reviewofinetermlibrationresults <br />♦r Evaluationofbillingsofiware - <br />results and recommendations <br />• leakageinthesystem -resultsanddiscussion <br />* Studyrecommendationsandcondusions <br />Carter -Burgess <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.