My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-H Lost Water Study
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
03 - March
>
2002-03-11
>
06-H Lost Water Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 10:32:25 AM
Creation date
3/5/2002 4:17:02 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-H
AGENDA - Type
RESOLUTION
Description
Award contract for Water Lost and Unaccounted For Study to Carter & Burgess
AGENDA - Date
3/11/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />1 <br />~ <br />~ <br />~ <br />I <br />~ <br />~ <br />' <br />! <br />1 <br />1 <br />Proposa/ <br />Comprehensive Water Distribution System Audit <br />Section 6 <br />References <br />The Carter &Burgess Team maintains an excellent working <br />tit DaleFisler <br />relationship with numerous municipal and public clients. <br />Ciry of Fort Worth <br />The best measure of past performance is that of our references <br />1000 Throckmorton <br />by our clients. We encourage you to contod our references <br />Fort Worth, TX 76102 <br />below to discuss our firm's and team members' past and <br />(817) 871 _g ppp <br />ongaing performance. <br />Projects: Northside II Water Transmission Main <br />Southside II Water Transmission Main <br />Carter ft Burgess <br />TeamMember: AlbertPetrasek,lr,PhD,PE <br />* lenniferCottingham <br />* MelissaKauth <br />Dallas Water Utilities <br />San Antonia Water System Purchasing Depariment <br />2121 Main St., Suite 300 <br />1001 E. Market Street <br />Dallas, TX 15201 <br />San Antonio, TX 78298 <br />(214) 948-4563 <br />(210) 508-0433 <br />Projech. Lake Fork Pipeline <br />Projects: SA WS Eval. and Assess. of Operations <br />Lake Tawakoni Pipeline <br />SAWS IT Strotegic Plan <br />Team Members: Albert Pehasek, Jr, PhD, PE <br />Team Member Larry Shaw, CPA <br />Ron Hayes, PE <br />Lin Lindsey <br />Severn Trent <br />* TerraceStewart <br />PipeIIIIe Services <br />Dallas Water Uti lities <br />1500 Marilla 4AN <br />* Mike Brawn <br />Dallas, TX 75201 <br />Ciry of Longuiew <br />(214) 610-3144 <br />P 0 Bax 1952 <br />Team Member Albert Petrasek, Jr, PhD, PE <br />Longview, TX 75606 <br />(903) 759-1053 <br />* Charlie Stringer, P.E. <br />Projech. Longuiew, Texas Meter Accurary Tests <br />Dallas Water Utilities <br />Team Member Tom Bean, PE <br />2121 Main St., Suite 300 <br />Dallas, TX 75201 <br />* Frank Rodriguez <br />(214) 948-4578 <br />CiryofCorpusChristi <br />Project.• Lake Pales6ne Water U6lization and <br />1201 Leopard <br />Pipeline Alignment <br />Corpus Christi,lX 78401 <br />Team Member. Albert Pehasek, Jr, PhD, PE <br />(361) 861-1214 <br />Project Corpus Chris6, Texas MeterAccurary Tests <br />Team Member Tom Bean, PE <br />Carter-Burgess <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.