Laserfiche WebLink
~ <br />~ <br />~ LARRV SHAW, CPA <br />Page 3 <br />~ <br />~ . Regionalization of Tampa Bay Water, Tampa Bay, FL; Management Consultant. Participated in a state mandated study ta <br />develop a regionul water supply utiliry for three counties and three city utilities in the Tampa Bay, Florida area. Work <br />~ involved condition assessment of facilities with an engineering firm, the development of the initial cost based pricing <br />~ strudure, the assignment of value to facilities donated by each member government and the develapment of inember <br />contracrs with the regional utility. <br />~ <br />~ . Privatization Evaluations; Senior Management Consultant. Evaluated the approprioteness of privatizing all ar a portion of <br />utiliry operations for utilities in Tezas, lauisiana, Distrid of Columbia, Florida ond Ohio. <br />a . Utiliry System Eunluation, Son Antonio, TX; Projed Monager. Managed a projed, with the ossistonce of fwo engineering <br />~ firms, to assess the condition af u wnter and wastewater system owned and operated by a developer for potential purchase <br />~ by the Liry of San Antonia. <br />~ Information Technology Project Experience <br />a . San Antonio Water System (SAWS) IT Master Plan, San Antonio, Texas; Projed Diredor. Carter 8 Burgess project team <br />members managed the development of a strategic IT plan identifying the vision and recommendatians for technology for <br />a the future. Entails evaluotion of the current systems in informotion manogement, technology and automation. A specific <br />~ outsourcing study is also being performed. <br />~ . DWU Information Technology System Development 8 Implementation, Dallas, TX; Projed Manager. Managed the design, <br />~ package seledion and implementation of a customer accounting ond billing system for the Dallas Water Utilities <br />incorporating water, wastewater, solid waste and storm water services. Performed an organizational assessment to reflect <br />$ the changes needed to accommodate and obtain moximum benefit from the designed billing system to be implemented <br />~ within iwelue months. <br />3 . Informatian Technology System Development 8 Implementation, Various Locations, TX; Management Consultant. Provided <br />a technicol ossistance ond quoliry ossurance reviews for similar customer system projeds in Tucson, Honolulu, Cincinnnti, <br />Columbus, Trenton, Miami, Winnipeg, San Antonio nnd the Sam Nouston Eledric Cooperative. <br />~ <br />a . Informotion Technology System Development, Son Antonio, A. Project Monager. Monoged the design, development ond <br />implementation of financial planning, fized assets, p[ojed tracking and inuentory systems nt a metropolitan wastewater <br />a utility in Texos. <br />a Evaluation of Billing System's Development, San Antonio, TX; Projed Monager. Monoged the evaluotion of o custom <br />~ • designed and developed utility billing system for a water, wastewater and storm water utiliry in process of development by <br />~ another firm. Recommended abandonment of the project and restarting the projed using standard and proven system <br />development methodalagies. Performed similor engogements at another water utility and at a gas utiliry. <br />~ <br />~ <br />F] <br />a <br />