My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-H Lost Water Study
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
03 - March
>
2002-03-11
>
06-H Lost Water Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 10:32:25 AM
Creation date
3/5/2002 4:17:02 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-H
AGENDA - Type
RESOLUTION
Description
Award contract for Water Lost and Unaccounted For Study to Carter & Burgess
AGENDA - Date
3/11/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposa/ <br />Comprehensive Water Distribution System Audit <br />~ <br />Section 2 <br />Firm Overview <br />Carter & Burgess <br />Carter & Burgess, Inc. wasfounded in 1939 in FortWorfh, <br />Texas as a unique partnership beiween childhood friends. <br />One was a civi l engineei. The ather was a landsmpe archited. <br />Today, Carter & Burgess, Inc. is a full-service, multi- <br />disciplined cansulting firm offering planning, engineering, <br />architedure, surveying, mnstruction managementand related <br />services with over 2,500 employees i n 36 offices across the <br />nation. The firm has maintained an office in Dallas since <br />1960. lacal personnel resources in our Dallas and Fort <br />Worth offices indude more than 1,115 piofessional, <br />techniml, and support staff members. <br />From the beginning, cooperation among mized design <br />disciplines set the stage for what has become on often- <br />imitated way of doing business - offering camplete services <br />from one compony. While others moytry and pull together <br />a partnership for the duration of a projed, Carter 8 Burgess <br />mn seamlessly integrate each and every in-house discipline <br />asnecessory. Thisdepthoftenenablesustoassistyauwithout <br />the need for additional consultants. <br />Industry Recognition <br />Design professionals at Carter 8 Burgess maintain the talent <br />and ingenuiry necessary to mntrol projed costs while meeting <br />strict schedules. Some 85 percent of our work is repeat <br />business from clients. On several occasians we have been <br />the proud recipient of distinguished acknowledgmentsfor <br />our effarts. <br />Engineering News Record magazine <br />* 30"in a list of top 500 U.S. design firms (April 2001) <br />* 141hinalistoftop20WaterTransmissionLinesfirms(Apri12001) <br />* 10'h in a list of top 25 Sanitary/Srorm Sewers firms (April 2001) <br />* 10' in a list of top 100 Pure Design firms (April 2001) <br />Building Design 8 Construction magazine <br />* 7th in a survey of 300 A/E/C firms for volume of work completed in the <br />commercial, institutianol, and industriol projedmarkets (Ju1y2001) <br />~u... Consulting-Specifying Engineer magazine <br />` +t l Om in a list of top 100 firms engaged in mechaniml and electrical design <br />(August 2000) <br />Carter lZurgess <br />
The URL can be used to link to this page
Your browser does not support the video tag.