My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-CITY COUNCIL 01.14.13 MINUTES
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2013
>
01 January
>
01.28.13
>
05-CITY COUNCIL 01.14.13 MINUTES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2013 3:02:35 PM
Creation date
1/24/2013 3:02:34 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iz/i3/iz <br />9.0 Cox Field Airport: Establish and maintain Cox Field as the region's primary general aviation <br />airport. <br />9.1 Upgrade Runway 17-35 to FAA Airport Reference Code (ARC) C/D-II design standards. <br />9.1.1 Create and maintain larger runway safety areas and object free zones on the <br />north and south ends of the runway, clearing, grubbing, grading, and relocating <br />fences as necessary, by 12/2021. <br />9.2 Adhere to appropriate safety design standards on Runway 17-35. <br />9.2.1 Create and maintain larger runway safety areas and object free zones on the <br />north and south ends of the runway, clearing, grubbing, grading, and relocating <br />9.3 <br />9.4 <br />9.5 <br />.� <br />9.7 <br />9.8 <br />fences as necessary, by 12/2021. <br />Close and remove crosswind Runway 3-21. <br />9.3.1 Close and remove runway and associated pavements by 12/2029. <br />Relocate the Runway 14 threshold 280 feet southeast in order to provide adequate safety <br />measures associated with holdlines. <br />9.4.1 Complete relocation by 12/2020. <br />9.4.2 Simultaneously realign associated taxiways. <br />Construct additional taxiways and realign existing taxiways associated with Runways 17-35 <br />and 14-32. <br />9.5.1 Extend parallel taxiway A 1,400' south to Runway 35 Threshold by 12/2014. <br />9.5.2 Extend terminal area/hangar access taxiway 375' west by 12/2015. <br />9.5.3 Extend terminal area/hangar access taxiway an additional 375' west by 12/2020, <br />or as required by actual hangar development. <br />9.5.4 Realign taxiway perpendicular to Runway 17-35 with removal of Runway 3-21. <br />Improve instrument approach procedures on all runway ends. <br />9.6.1 Install a medium intensity approach lighting system with runway indicator lights <br />(MALSR) on Runway 35 by 12/2020. <br />9.6.2 Install a MALSR on Runway 17 by 12/2025. <br />Acquire land for approach protection. <br />9.7.1 Acquire approximately 51.9 acres for approach protection south of Runway 17- <br />35 by 12/2018. <br />9.7.2 Acquire approximately 4.1 acres for approach protection southeast of Runway <br />14-32 by 12/2028. <br />Decrease the width of Runways 17-35 and 14-32 to 100 feet and 75 feet, respectively. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.