Laserfiche WebLink
Item No. 14 <br />melno�andum <br />To: c�ty co���l <br />John Godwin, City Manager <br />FROM: Shawn Napier, P.E., Director of Engineering, Planning & Development <br />SUBJECT: PROFESSIONAL SERVICES CONTRACT WITH DENNEY ARCHITECTS <br />FOR WORK ON THE GRAND THEATER <br />DATE: 1-18-2013 <br />BACKGROUND: The Grand Theater has had been discussed at several City Council Meetings <br />in the recent past. At the August 13th meeting council gave direction with moving forward on <br />the idea of replacing the roof and roof shell structure over the existing entrance lobby area <br />(approximately 18-feet by 70-feet) and rebuilding the fa�ade in conjunction with the Leadership <br />in Lamar County Class Project. Since that time staff has been working with Denney Architects, <br />Dietz Engineering and Dr. and Mrs. Terry Kilgore to develop a plan. The Kilgore's own the <br />building to the east of the Grand Theater. One item that is in the proposed plan that was not <br />discussed earlier was a fire wall that would separate the Kilgore's building from the lobby area <br />of the Grand Theater. The wall would also support the new roof structure. <br />STATUS OF ISSUE: This contract is for the design of the fa�ade, front entry, fire wall and roof <br />of the Grand Theater. Denney architects will prepare plans and specifications, the structural <br />engineering will be performed by Dietz Engineering. <br />BUDGET: Denney Architects fee for the projects is not to exceed $18,500. This will be funded <br />from the City's portion of the hotel motel tax that is set aside as the Special Purpose Grant — <br />Hotel Tax. <br />RECOMMENDATION: Approve a contract with Denney Architects for professional services to <br />repair the Grand Theater. <br />