Laserfiche WebLink
Item No. 21 <br />memo�andum <br />TO: City Council <br />John Godwin, City Manager <br />FROM: Shawn Napier, P.E., Director of Engineering, Planning & Development <br />SUBJECT: PROFESSIONAL SERVICES CONTRACT WITH HAYTER <br />ENGINEERING, INC. <br />DATE: 1-22-2013 <br />BACKGROLJND: The City of Paris has been replacing sidewalks in downtown Paris over the <br />past few years with grant money from the state. The City of Paris proposed to replace sidewalks <br />on both sides of Bonham St. between 1 st St and 2nd St. The City Council authorized an <br />application at the September 24, 2012 meeting for a Texas Capital Fund Main Street grant to <br />replace sidewalks, but the City was not awarded the grant. The Capital Improvement Program <br />has given the City the opportunity to fund this project and include a few more problem areas. <br />This proposed project will replace sidewalks on both side of Bonham St. between lst St and 2°d <br />St. with the exception of two basement areas. It will also include a portion of sidewalks in front <br />of the YWCA on Lamar Ave. and a section of sidewalk on Grand Ave in front of the Salvation <br />a�y. <br />STATUS OF ISSUE: This contract is for the design of the sidewalks, electrical and drainage. <br />The design will incorporate plans, specifications and estimates to be provided to the City in order <br />to put the project out for bids. The project will include new light poles and drainage on Bonham <br />St. and sidewalks in the two other areas mentioned above. <br />BUDGET: Hayter Engineering's fee for the design of the project is $23,000. This will be <br />funded from the Capital Improvement Program. <br />RECOMMENDATION: Approve a contract with Hayter Engineering, Inc. for engineering <br />services on downtown sidewalk replacements. <br />