Laserfiche WebLink
ITEMNO. I QUANTfTY UNIT <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />� <br />23 <br />1 <br />1 <br />2 <br />1 <br />5 <br />1 <br />�oo <br />400 <br />6,890 <br />2,510 <br />45 <br />137 <br />7,590 <br />6,890 <br />2,510 <br />32 <br />370 <br />45 <br />40 <br />4 <br />2,000 <br />1,210 <br />1,860 <br />LS <br />EA <br />LS <br />MOS <br />EA <br />LF <br />C.Y. <br />SY <br />LF <br />SY <br />TN <br />SY <br />SY <br />LF <br />SY <br />SY <br />SY <br />SY <br />EA <br />LF <br />SY <br />LF <br />EXHIBIT B <br />6th Street 8 24th Street Pavement Replacement Project <br />City of Paris <br />OPINION OF PROBABLE COST <br />DESCRIPTION <br />EROSION CONTROL INCLUDING SWPPP <br />FURNISH & INSTALL CAPITAL IMPROVEMENTS SIGN <br />BARRICADE, SIGN, TRAFFIC CONTROL FOR ENTIRE PROJECT <br />PORTABLE TEMPORARY MESSAGE BOARD <br />REMOVE TREE <br />TREE PROTECTION <br />UNCLASSIFIED ROADWAY EXCAVATION <br />SAWCUT, REMOVE & DISPOSE ASHALT PAVEMENT <br />SAWCUT, REMOVE 8 DISPOSE CONCRETE CURB & GUTTER <br />SAWCUT, REMOVE & DISPOSE CONCRETE DRIVEWAY <br />HYDRATED LIME (36 Ibs/sy) <br />SUBGRADE MIX LIME <br />CONSTRUCT 10" HMAC PAVEMENT <br />CONSTRUCT CONCRETE CURB & GUTTER <br />CONSTRUCT CONCRETE FLUME <br />4" CLASS "A" REINFORCED CONCRETE 5' SIDEWALK <br />CONSTRUCT 6' CLASS "C" RE5IDENTIAL DRIVEWAY PAVEMENT <br />BARRIER.FREE RAMP <br />ADJUST EXISTING VALVE COVER <br />ROUTE AND SEAL PAVEMENT CRACKS <br />SODDING <br />FURNISH AND INSTALL 4" DOUBLE YELLOW LANE LINE STRIPING <br />CONSTRUCTION CONTINGENCY (25%) <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />UNIT COST <br />Page 1 of 1 <br />H:IWPDOCSIPROPOSAUPARIS16th St and 24th St16th & 24th Streef Replacement EOPC DEC-2012.xis <br />3,000.00 <br />500.00 <br />12,000.00 <br />600.00 <br />500.00 <br />10.00 <br />12.00 <br />6.00 <br />3.00 <br />8.00 <br />150.00 <br />3.00 <br />42.D0 <br />17.00 <br />50.00 <br />3D.00 <br />35.00 <br />50.00 <br />350.00 <br />1.75 <br />4.50 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />TOTAL COST <br />3,000.00 <br />1,000.00 <br />12,000.00 <br />3,0�.00 <br />500.00 <br />1,000.00 <br />4,800.00 <br />41,34p.00 <br />7,530.00 <br />360.00 <br />20,550.00 <br />22,770.00 <br />289,380.00 <br />42,670.00 <br />1,600.00 <br />11,100.00 <br />1,575.00 <br />2,000.00 <br />1,400.00 <br />3,500.00 <br />5,445.00 <br />