Laserfiche WebLink
INTEROFFICE MEMORANDUM <br />TO: MICHAEL E. MALONE, CITY MANAGER <br />FROM: KENT KLINKERMAN <br />SUBJECT: EAST PRICE STREET CLOSING <br />DATE: 4/1 /2002 <br />CC: KARL LOUIS; RONNIE GROOMS; SHAWN NAPIER <br />On March 21, 2002, the leadership of Police, Fire, Engineering and <br />EMS met to review the site plan of the north side of the Lamar County <br />Courthouse renovations with specific emphasis on the proposed <br />closing of East Price Street between North Main and Northwest 15t <br />Street. Contact was made with B.P. Denney Architects via <br />conference call for clarification of the site plan. Specific comments <br />from different departments are attached. <br />Summary: <br />o Accessibility to the north side of the courthouse structure by the <br />Fire Department will be impacted. It is estimated that this <br />barrier to accessibility can be overcome with assistance from <br />Denney Architects. <br />o Response times to the courthouse will be impacted minimally. <br />Strategic maneuvering of emergency response vehicles on <br />scene will be impacted slightly. <br />o New traffic flow patterns may necessitate a modification of the <br />signal lights at North Main/Pine Bluff and Graham Street/NW 1 St <br />Street. <br />o Utility improvements will not be impeded due to the closing. <br />