My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-PROFESSIONAL SERVICES CONTRACT WITH HAYTER ENG
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2013
>
02 February
>
02.25.13
>
11-PROFESSIONAL SERVICES CONTRACT WITH HAYTER ENG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2013 10:43:49 AM
Creation date
2/21/2013 10:43:48 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDITIONAL ENGINEERING SERVICES <br />The following "additional services" are known to be required at the time of this agreement, and are <br />authorized at per diem rates shown as Exhibit B. These and other "additional services" which may be <br />added as required will be paid for as additional services in accord with Section 3b. <br />2.4 Biddin� <br />2.4.1 Assist CITY in advertising for bids for a sin�?le prime contract for the Work. <br />2.�.2 Prepare addenda as appropriate to interpret, clarify or expand the Bidding Documents. <br />2.4.3 Attend the bid opening, prepare bid tabulation sheets, and recommend an award if deemed <br />appropriate. <br />2.5 Construction Review <br />2.5.1 ENGINEER sha11 provide construction review services as requested by CITY. Such <br />services may include the followi.ng: <br />2.5.2.1 ENGINEER shall ma.ke visits to the site at intervals ENGINEER deems necessary, in <br />order to observe the progress and quality of the CONTRACTOR' S work. Based on <br />information obtained during such visits and on such observations, ENGINEER shall <br />endeavor to detennine in general, if such work is proceeding in accordance with the <br />contract documents. <br />2.5.2.2 ENGP.vEER'S visits to, and representation by the on-site observer at the site, will enable <br />ENGINEER to better cazry out the duties and responsibilities assigned to ENGINEER <br />during the Canstruction Phase, and, by exercise of EI�TGINEER'S efforts as an experienced <br />and qualified design professional, provide CITY a greater degree of confidence that the <br />completed work of CONTRACTOR will conform generally to the contract documents. <br />ENGINEER sha11 not, however, during such visits or as a result of such observations, <br />supervise, direct or have control over CONTRACTOR' S work, nor sha11 ENGIl�iEER <br />have authority over or responsibility for the means, methods, techniques, sequences or <br />procedures of construction selected by CONTRACTOR or for safety precautions and <br />programs incident to the work, or for any failure of CONTRACTOR to comply with laws, <br />regulations, codes or orders applicable to CONTRACTOR'S work. Accordingly, <br />ENGINEER can neither guarantee the performance of the construction contracts by <br />CONTRACTOR, nor assume responsibility foz CONTRACTOR' S failure to furnish and <br />perform their work in accordance with the contract documents. <br />2.5. � Interpreta.tions and Clarifications - ENGINEER shall issue necessary interpretations and <br />clarifications of the contract documents and in connection therewith prepare work <br />� <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.