My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-C PD Architect Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
05 - May
>
2002-05-13
>
06-C PD Architect Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:52:09 AM
Creation date
5/10/2002 12:41:45 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-C
AGENDA - Type
RESOLUTION
Description
Architectural Services Contract for Law Enforcement Center - Brinkley-Sargent
AGENDA - Date
5/13/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.6.5 CHANGES IN THE WORK <br />2.6.5.1 The Archited shall prepate Change Orders and Construction Ch; <br />the Owners approval and execution in accordance with the Contract <br />Architect may authorize minor changes in the W6rk not involving an adju: <br />Sum or an extension of the Contract Time which are consistent with the inb <br />Documents. If necessary, the Architect shall prepare, reproduce and distril <br />Specifications to describe Work to be added, deleted or modified, as pr " <br />2.8.2. <br />2.6.5.2 The Architect shall review properly prepared, timely requests""Gygfie Owner or <br />Contractor for changes in the Work, including adjustments to the ~s as~l Sum or Contract <br />Time. A properly prepared request for a change in the Work shall b~;a - ' ied by sufficient <br />supporting data and information to permit the Archilect to make, le determination <br />without extensive investigation or preparation of additional dra~mv ` `'ecifications e <br />Architect determines that requested changes in the Work are nbt teVIy different fr <br />requirements of the Contract Documenls, the Architect may is3u~ er for a mino ' <br />in the Work or recommend to the Owner lhat the requested c , <br />lY~~t~, {,,~enied. <br />2.6.53 If the Architect determines that implementati t~°~ ~li~ff~""~5t~ ch " d <br />result in a material change to the Conlract that may cau djus ~!n[~ 11 <br />e <br />or Contrad Sum, the Architect shall make a recommendatton~t6e 0t~ , <br />authorize further investigation of such change. llpon such authonzati0m~, r~tid ~S ' ri <br />information furnished by the Contractor, if any, the Architect shall estimate the a~di r <br />and time that might result from such change, including any additional costs attributable to a <br />Change in Services of the Architect. With the Owner's approval, the Archiled shall incorporate <br />those estimates into a Change Order or other appropriate documentation for the Owneis <br />exewtion or negotialion with the Conlractoc qt U~ ~;'ri ~}~DESM <br />2.6.5.4 The Architect shall maintain <br />2.6.6 PROJECT COMPLETION ' ~ p.~ <br />2.6.6.1 The Architect shall conduct inspections i 'c ihe date or <br />Completion and the date of final completion, sha(I re ce~vi~ ' in ihe <br />lC <br /> <br />the Owner, for the Owner's review and records, written <br />tQaetanCtes an,d <br />required by the Contract Documents and assembled by the Contrdit~rF;01 <br />Ceriificate for Payment based upon a final inspection indicating t8e'WOi <br />requirements of the Contract Documents. <br />2.6.6.2 The Architect's <br />Representative to check <br />Documents and to verify i <br />of Work to be completed, <br />ARTICLE 2.7 <br />2.7.1 <br />noted <br />Reprodvction of the material <br />on of the AIA violates the copl <br />!,(ion. WARNING: Unlicensed F <br />I ,sewtion. This dowment <br />I with the Owner's L <br />the requirements of ihe <br />he lisl submiltedbv:t68'[ <br />Work. <br />This document has importanf legal <br />consequences. Corsultation with an <br />attorney is encouraged with respect to <br />its completion or rtadification. <br />AUlHENIICAIION OF THIS <br />ELECTRONICALLY DRAFTED AIA <br />DOCUMENi MAY BE MADE BY USING <br />AIADONMENTD40L . <br />orward to <br />ocuments <br />ue a final <br />wilh the <br />Cst' "'led <br />t'hlilract <br />~j~`tractor <br />n'~ ti~~~. 140;v <br />iform the induding ~ <br />forward to the Owner. (i) consent <br />$"reta{tta e or the making of final <br />nds indemnifying the <br />Owner's Designated Representative <br />or facility operation services. <br />W$Y~'..fantial quotation of its provisions <br />E~e United States and will subject the <br />4 lates U.S. copyright laws and will <br />~ ally produced with permission of the <br />iiolation until the date of expiration as <br />1121922, which expires on 101`3112002. <br />19 <br />O 1997 AIAO <br />AIA DOCUMENT 8141 - 1997 <br />STANDARDFORM AGREEMENT <br />The American Instiiute of Architects <br />1735 New York Avenue N.W. <br />Washington, D.C. 20006-5292 <br />
The URL can be used to link to this page
Your browser does not support the video tag.