My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-C PD Architect Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
05 - May
>
2002-05-13
>
06-C PD Architect Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:52:09 AM
Creation date
5/10/2002 12:41:45 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-C
AGENDA - Type
RESOLUTION
Description
Architectural Services Contract for Law Enforcement Center - Brinkley-Sargent
AGENDA - Date
5/13/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Harold E. Saraent <br />Brinkley~Saraent Architects <br />5000 Quorum Drive. Suite 123 <br />Dailas. Texas 75254 <br />1.1.3.5 The consultants retained at the Architect's exE <br />(Lis( discip/ine anA, ifknow2 identily [hem byname and address.) <br />Mechanical. Electrical and Plumbing Engineer <br />Structural Engineer <br />LandscaQe Architect <br />AV / Acoustical Engineer <br />ADA Consultant <br />Civil Engineer <br />Interior Designer <br />1.1.4 Other important initial information is: <br />N/A <br />1.1.5 When the services under this Agreement inclu <br />General Conditions of the Contract for Conslruction <br />Azoi current as of the date of this Agreement, or as follo <br />1.1.6 The information contained in this Article i.i <br />Owner and Architect in determining the Architect's <br />recognize that such information may change and, in tl <br />shall negotiate appropriate adjustments in schedule, cc <br />acwrdance with Paragraph 1.33. <br />ARTICLE 1.2 RESPONSIBILITIES OF THE <br />1.2.1 The Owner and the Architect : <br />respedive obligalions under this Agreeme <br />working relationships among all members c <br />1.2.2 OWNER <br />1.2.2.1 Unless othetwise provided under ihis Agr e ner r mafl`dprtivide full <br />w, a ~ ~3~t . <br />information in a timely manner tegarding requirements fo2 an~~, zp ~lo lp'5 n,~~~?io~ecL The <br />Owner shall furnish to the Architect, within 19 days after''~t~tl~en request, <br />information necessary and relevant for the Architect to evaluate, g~v"e hpttoi enfo ce lien <br />[ights. <br />1.2.2.2 The Owner shall eri ~ <br />p e,t for the Project indudmg thaL,tr'ton <br />allocated for the Cost of the tsignifcantly mcrease or dectease the <br />overall budget, the portion~~+', Cost of the Wqrk, p coni encies <br />included in the overall ~t'T8 porlion o ~el~ oF the <br />Architect to a correspon ' in the Proiec <br />required <br />Reproduction of the material <br />ion of the AIA violates the cop <br />document <br />noted below. <br />the Owner shall furnish tests, <br />Documents, such as structural, <br />i tantial quotation of its provisions <br />e United States and will subject the <br />olates U.S. copyright laws and will <br />cally produced with permission of the <br />riolation until the date of expiration as <br />1121922, which expires on 10/31/2002. <br />3 <br />~ <br />O 1997 AIAM <br />AIA DOCUMENT 8141 - 1997 <br />STANDARDFORM AGREEMENT <br />The American Institute of Architecis ~ <br />1735 New York Avenue N.W. <br />Washingion, D.C. 20006•5292 <br />
The URL can be used to link to this page
Your browser does not support the video tag.