My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-I Water Production Study
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
05 - May
>
2002-05-13
>
06-I Water Production Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:54:38 AM
Creation date
4/29/2002 5:08:07 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-I
AGENDA - Type
RESOLUTION
Description
Award Water Prodecution Study - Freese and Nichols, Inc.
AGENDA - Date
5/13/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. SUMIYIARX <br />A. Comparison of Plant Performance from Initia] Comprehensive Performance <br />Evaluation to the Teaas Optimization Program Goals Achieved <br />Utilizing the inirial comprehensive performance evaluation u a baseline for performance, <br />comparison and evaluauon, Figure 19 illustrates the settled water turbidity frequency plot. <br />Settled water turbidity has been improved from meeting a 2.0 NN less than 25 percent <br />of the time, to meeting a 2.0 NTU 99.9 percent of the time. Figure 20 illustrates the <br />bottom line resulu for finished water turbidiry frequency plot. The plant performance <br />increased from achieving a 0.1 NN appro;cimately less than 5 percent of the time to <br />achieve a 0.1 NN over 100 percent of the rime. <br />Figure 20: Finished Water Turbidity Performance <br />1 <br />Fioure 19: Settled Water Turbidity Performance <br />
The URL can be used to link to this page
Your browser does not support the video tag.