My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03&04 Substandard Building Ord
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
05 - May
>
2002-05-30
>
03&04 Substandard Building Ord
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:48:04 AM
Creation date
5/24/2002 8:40:08 PM
Metadata
Fields
Template:
AGENDA
Item Number
4
AGENDA - Type
ORDINANCE
Description
Substandard Building Ordinance
AGENDA - Date
5/30/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 7-85. Permit fees. <br />The fee for the issuance of a secured building permit shall be <br />Section 7-86. Pernut duration. <br />A secured building permit issued in accordance with the terms and provisions <br />of this article, and provided said building governed by said permit continues to be in <br />all things compliant with this article, shall be valid for a period of one year from the <br />date of issuance. <br />Section 7-87. Permit renewal. <br />A secured building permit as authorized herein shall be subject to annual <br />renewals provided the building owner files proper application on such forms as shall <br />be established by the chief building official for such permit renewal and satisfies all <br />of the following requirements: <br />(1) A showing that all of the original requirements for issuance of the <br />permit continue to be satisfied, including a showing that the condition <br />of the building is structurally sound and that the building will meet or <br />exceed the standards for issuance of a permit set out in section 7-82 <br />herein. <br />(2) Payment of the appropriate permit issuance fee as set out in section 7- <br />85 herein. <br />(3) An inspection shall be performed by an inspector of the owner's <br />choosing, provided such inspector shall meet all the requirements of <br />state law as set out in Title 7, Subtitle A, Chapter1102 of the Texas <br />Occupations Code, regarding licensed real estate inspectors. The <br />inspector shall document in writing the results of the inspection, such <br />documentation to be in such form as the building official shall specify. <br />Any inspector who intentionally or repeatedly falsifies or provides <br />incomplete reports as required herein may be excluded by the building <br />official as an acceptable inspector for the purposes of this article. <br />Section 7-88. Reoccupation of a secured building. <br />Before a building governed by a secured building permit can be reoccupied, <br />the building owner must satisfy the following conditions: <br />Page 21 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.