My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17-BID AWARD FOR THE 6TH AND 24TH SE STREET PROJECT
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2013
>
04 April
>
04.08.13
>
17-BID AWARD FOR THE 6TH AND 24TH SE STREET PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2013 2:18:07 PM
Creation date
4/4/2013 2:18:07 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
menzo�andum <br />TO: City Council <br />John Godwin, City Manager <br />FROM: Shawn Napier, P.E., Director of Engineering, Planning & Development <br />SUBJECT: BID AWARD FOR THE 6TH SE AND 24TH SE STREET PROJECT <br />DATE: Apri12, 2013 <br />BACKGROLJND: KSA and the City of Paris have been looking at the current conditions of <br />streets in the City as a part of the Capital Improvement Plan. Two streets have been selected to <br />be completely reworked from the subgrade to the surface. The two streets are 6th SE Street from <br />Lamar Ave. to Clarksville St. and SE 24�" Street from College to just north of Polk St. At the <br />January 28th City Council meeting, a contract was approved with Grantham & Associates for the <br />design of the two projects. The project was advertised for bids in the Paris News on March l lth <br />and 17th and bids opened on April lst at 2:00 P.M. The City received two bids on the project, <br />one from R.K. Hall, LLC. in the amount of $643,821.65 and one from Richard Drake <br />Construction Company, L.P. in the amount of $658,158.57. <br />STATUS OF ISSUE: These two roadway projects will involve removing the existing roadway <br />to the natural soil and rebuilding it with asphalt. The project will also involve replacing or <br />adding sidewalk, ramps, curb & gutter and valley gutters. In January the initial estimated cost of <br />the project was $637,800.00. The primary difference in project cost was asphalt prices which <br />fluctuate with fuel prices. Attached to this memo is a recommendation from Grantham & <br />Associates, Inc. to award the bid to R.K. Hall, LLC and a bid tabulation. <br />BUDGET: This will be funded from the Capital Improvement Program. <br />RECOMMENDATION: Award a bid to R.K. Hall for the 6th SE and 24th SE Street <br />Reconstruction Project. <br />5U <br />
The URL can be used to link to this page
Your browser does not support the video tag.