My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11&12 Faulk & Foster Zoning
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
07 - July
>
2002-07-08
>
11&12 Faulk & Foster Zoning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:21:27 AM
Creation date
7/3/2002 9:25:49 PM
Metadata
Fields
Template:
AGENDA
Item Number
11 and 12
AGENDA - Type
ZONING ORDINANCE
Description
Faulk & Foster
AGENDA - Date
7/8/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sec. 28-105. Permit Required. <br /> <br /> Frbm and after the effective date of this ordinance, no person shall install <br />or construct any WCF unless and until a Tower Use Permit (TUP) has been issued <br />pursuant to the requirements of this ordinance. <br /> <br />Sec. 28-106. General Requirements. <br /> <br /> (a) Platted Lots. Each WCF, including the support structure and any <br />related equipment facility, shall be located on a platted lot. <br /> <br />(b) Height Standards. <br /> <br />(1) <br /> <br />Attached WCF. The total height of an existing building or structure <br />to which a WCF has been attached shall not exceed two hundred <br />sixty (260) feet, subject to the other terms and provisions of this <br />ordinance. <br /> <br />(2) <br /> <br />WCF with Support Structures. WCF with Support Structures shall <br />have a maximum height of two hundred sixty (260) feet, subject to <br />the other terms and provisions of this ordinance. <br /> <br /> (c) Setback Standards. All WCF shall be set back from any adjoining lot <br />line or adjacent street curb line a distance equal to the height of the WCF itself, <br />including any support structure and antenna array. In determining the setback <br />requirement, the distance shall be measured from the base of the support structure. <br /> <br />(d) Separation from off-site uses/designated areas. <br /> <br />(1) <br /> <br />WCF including Support Structures and antenna array shall be <br />separated from all lands zoned SF-1, SF-2, SF-3, 2F, MF-1, or MF- <br />2 by a minimum of two hundred sixty (260) feet. ~ <br /> <br />(2) <br /> <br />Separation ofa WCF from such off-site uses shall be measured from <br />the base of the WCF to the lot line of the off-site use following a <br />straight line from the base of the WCF to the closest point of the <br />designated zoned property. <br /> <br /> (e) Compliance with existing City ordinances regarding preservation of trees <br />and other vegetation. All WCF facility installations shall comply in full with the <br />City's requirements regarding the preservation of trees and other vegetation <br />incident to any construction activity. <br /> <br />-7- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.