Laserfiche WebLink
4. BIDDER will complete the work for the following price(s): <br /> <br />UNIT PRICE SCHEDULE <br /> <br />NO. ITEM <br /> <br />1. Power operated planing machine with <br /> personnel <br /> <br />2. 12 yard dump truck with driver <br /> <br />ESTIMATED UNIT TOTAL <br />QUANTITY PRICE PRICE <br /> <br />50 hours ' $ .~"1 ~ $ ~'~. "l ~ rD <br /> <br />225hours $ ~::~4 oo $ '"I:(.oSC3 oo <br /> <br />3. Hot mix asphaltic concrete, type D <br /> installed. (TxDOT Item 340) <br /> <br />7800tons <br /> <br />TOTAL BASE BD PRICE "ly40 t-,,,,,a~u:,clb .e "l'v~,,'~-~-~ ~%x:~_L~.($ ~:~O"5:~. (use words) (figures) <br /> <br />BIDDER agrees that the Work will be substantially complete within 30 calendar days after the da:, <br />when the Contract Time commences to run as provided in paragraph 2.3 of the General Conditions, ac_,5 <br />completed and ready for final payment within 31 calendar days after the date when the Contract Ti.me <br />commences to run. <br /> <br />BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure rc <br />complete the Work on time. <br /> <br />The following documents are attached to and made a condition of this BID: <br /> <br />(a) Required Bid Security in the form of 5% bid bond or cashier's check made payable to the Ci~'. <br /> <br />Communications concerning the Bid shall be addressed to the address of BIDDER indicated below. <br /> <br />The terms used in this Bid which are defined in the General Conditions of the Construction Contrez: <br />included as part of the Contract Documents have the meanings assigned to them in the Gener?-2 <br />Conditions. <br /> <br />SUBMITTED ON July 2, ,2002. <br /> <br /> <br />