Laserfiche WebLink
4. BIDDER will complete the work for the following price(s): <br /> <br /> UNIT PRICE SCHEDULE <br /> <br /> ESTIMATED <br />NO. ITEM QUANTITY <br /> <br />1. Power operated planing machine with <br /> personnel <br /> <br />2. 12 yard dump truck with driver <br /> <br />3. Hot mix asphaltic concrete, type D <br /> installed. (TxDOT Item 340) <br /> <br />UNIT TOTAL <br />PRICE PRICE <br /> <br />50 houis <br /> <br />225 hours <br /> <br />7800tons <br /> <br />$ <br /> <br />$/8, 750.00 <br /> <br />s fl, <br />$ 7 2. oo <br /> <br />x,] /~use words) g/~]~ (figures) <br /> <br />BIDDER agrees that the Work will be substantially complete within 30 calendar days after the date <br />when the Contract Time commences to run as provided in paragraph 2.3 of the General Conditions, and <br />completed and ready for final payment within 31 calendar days after the date when the Contract Time <br />commences to run. <br /> <br />BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to <br />complete the Work on time. <br /> <br />The following documents are attached to and made a condition of this BID: <br /> <br />(a) Required Bid Security in the form of 5% bid bond or cashier's check made payable to the City. <br /> <br />Communications concerning the Bid shall be addressed to the address of BIDDER indicated below. <br /> <br />The terms used in this Bid which are defined in the General Conditions of the Construction Contract <br />included as part of the Contract Documents have the meanings assigned to them in the General <br />Conditions. <br /> <br />SUBMITTED ON July 2, <br /> <br />,2002. <br /> <br /> <br />