Laserfiche WebLink
Division II-A <br />Meta Drs. & Windows <br />' P1E'PAI, DOORSt_ FRAMES, WINDOWS ANU GLASS <br />_ GEIVERAL: Fuznish and install all metal doors, frames, <br />~and metal framed windows, glass and glass setting as <br />scheduled. Cooperate with caulking Contractor where pre- <br />caulking is required. Coordinate work of this section <br />with other trades that may be affected. Mark or tape large <br />glass for safety during construction. All labor and material <br />in this section shall be guaranteed as called for under <br />"General Conditions". <br />SCOPE: This Division shall include: Hollow metal steel <br />doors and frames, metal frames for all interior wood doors, <br />panels, side lights, and transons. <br />It shall include the installation of finishing hardware <br />as called for under Division 8-C. <br />Caulking shall be provided under Division 7-D. <br />SHOP DRAWINGS: Submit shop drawings for the approval of <br />Architect on: metal doors, frames and glass. <br />GLASS: All glass shall be 1/4" tempered clear plate glass. <br />STEEL DOOR FRAMES: For all wood and steel doors shall <br />be 16 gauge double rabbeted as detailed and equal to those <br />manufactured by Republic Steel Co. <br />Frames shall be shop welded and ground smooth. Each jamb <br />shall have a welded-in base anchor attaching plate with <br />two power driven bolts. Each frame shall have a minimum <br />of 4 jamb anchors installed in jambs as wall is constructed. <br />All frames shall be mortised, reinforced, and tapped for <br />finishing hardware and provided with three rubber bumpers <br />per strike jamb installed at factory. All frames shall <br />be bonderized and receive one baked-on prime coat of paint. <br />Thresholds and weather-strips are called for in Division 8-C. <br />HOLLOW METAL STEEL DOORS: Shall be "Full Flush", 1-3/4" <br />thick, Series 57 - 1-3 4" thick, Republic Steel or approved <br />equal and of size and type shown on Door Schedule. <br />Face plates shall be not less than 18-gauge with sound <br />deadening material in core. Exterior metal doors shall <br />have urethane fill. <br />Doors shall be mortised, reinforced, and tapped for the <br />_ reception of finishing hardware as called for in Division 8-C. <br />Surface mounted hardware shall be drilled and tapped on the <br />job. Doors shall be phosphatized and prime painted. <br />l <br /> <br />