My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-D Animal Shelter Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
08 - August
>
2002-08-12
>
05-D Animal Shelter Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:30:22 AM
Creation date
8/9/2002 9:03:58 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
RESOLUTION
Description
Award the bid and authorize the contract for the construction of the City of Paris Animal Shelter
AGENDA - Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT <br />THIS AGREEMENT is dated as of the 12th day of August in the year 2002 by and between the City <br />of Paris (hereinafter called OWNER) and Reeves Construction Services, Inc. (hereinafter called <br />CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follow: <br />Article 1. WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The <br />Work project is generally described as follows: <br />Article 2. ARCHITECT <br />The Project has been designed by William M. Lightfoot AIA, Architect, Paris, Texas, who is <br />hereinafter called ARCHITECT and who is to act as OWNER' S representative, assume all duties and <br />responsibilities and have the rights and authority assigned to ARCHITECT in the Contract <br />Documents in connection with completion of the Work in accordance with the Contract Documents. <br />Article 3. CONTRACT TIME <br />3.1 The Work will be substantially completed and ready for final payment within 250 <br />calendar days from the date when the Contract Time commences to run, as provided in the <br />General Conditions. <br />3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence <br />of this Agreement and that OWNER will suffer financial loss if the Work is not completed <br />within the times specified above, plus any extensions thereof allowed in accordance with the <br />General Conditions. They also recognize the delays, expense and difficulties involved in <br />proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work <br />is not completed on time. Accordingly, instead of requiring any such proof, OWNER and <br />CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) <br />CONTRACTOR shall pay OWNER $150 for each calendar day that expires after the time <br />specified. <br />Article 4. CONTRACT PRICE <br />OWNER shall pay CONTRACTOR for completion of the work in accordance with the Contract <br />Documents in current funds as follows: <br />At the unit prices shown on the Unit Price Bid Schedule included in the Contract Documents. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.