Laserfiche WebLink
GENERAt~IFiFORMATION <br />INSTRUCTIONS <br />AIA DOCUMENT A201-1997 <br />ons of the Contract for Construction <br />a generalconditions Form, is intended to be used as one oF the contract <br />itract. In 'ye'a4ition, it is frequenUy adopted by reference into a variety of other <br />ect agr8eme~nis and the Contractor-Subcontractor agreements, to establish a <br />idary rC~~~nships on the typical construction project. <br />reference into two AIA Owner-Contractor agreements <br />ractor agreement and several AIA Owner-Architect agree- <br />trporated by reference into two design-build agreements <br />i Manager/constructor agreements (Alv/CMo-Part a and <br />ence when the prime Agreement between the Owner and <br />ihitect-Consultant agreements such u AIA Documents <br />is a valid legal drafting method, and documents so <br />ve contract. <br />for Construction between the Owner and [he <br />or Aiu-i997) <br />Supplementary Conditions, Drawings or SpeciFications, <br />ng AIA's MASTERSPEC and AIA Document ASii, Guide <br />the many parties imolved in the <br />icument used to allocate the proper <br />General Conditions <br />