05-D Animal Shelter Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:30:22 AM
Creation date
8/9/2002 9:03:58 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
RESOLUTION
Description
Award the bid and authorize the contract for the construction of the City of Paris Animal Shelter
AGENDA - Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
have agreed in writing concerning the period for correction of the Work and commencement of <br />warranties required by lhe Contract Documents. When the Contractor considers a portion <br />substantially complete, the Contractor shall prepare and submit a list to the Architect as <br />provided under Subparagraph 9.8.2. Consent of the Contractor to partial occupanty or use shall <br />not be unreasonably withheld. The stage of the progress of the Work shall be determined by <br />written agreement between the Owner and Contractor or, if no agreement is reached, by decision <br />of the ALChitect. <br />9.9.2 Immediately prior to such partial occupancy or use, the Owner, Contractor and Architect <br />shall jointly inspect the area to be occupied or portion of the Work to be used in order to <br />determine and record the condition of the Work. <br />9.9.3 Unless otherwise agreed upon, partial occupancy or use of a portion or portions of the <br />Work shall not constitute acceptance of Work not complying with the requirements of the <br />Contract Documents. <br />9.10 FINAL COMPLETION AND FINAL PAYMENT <br />9.10.1 Upon receipt of written notice that the Work is ready for final inspection and acceptance <br />and upon receipt of a final Application for Payment, the Architect will promptly make such <br />inspection and, when the Architect finds the Work acceptable under the Contract Documents and <br />the Contract fully performed, the Architec[ will prompfly issue a final Certificate for Payment <br />stating that to the best of the Architect's knowledge, information and belief, and on the basis of <br />the Architect's on-site visits and inspections, the Work has been completed in accordance with <br />terms and conditions of the Contract Documents and that the entire balance found to be due the <br />Contrador and noted in the final Certificate is due and payable. The Archited's final Certificate <br />for Payment will constitute a further representation that conditions listed in Subparagraph 9.10.2 <br />as precedent to the Coniractor's being entitled to final payment have been fulfilled. <br />9.10.2 Neither final payment nor any remaining retained percentage shall become due until the <br />Contractor submits to the Architect (i) an affidavit that payrolls, bills for materials and <br />equipment, and other indebtedness connected with ihe Work for which the Owner or the Owner's <br />property might be responsible or encumbered (less amounts withheld by Owner) have been paid <br />or otherwise satisfied, (z) a certificate evidencing that insurance required by the Contract <br />Documents to remain in force after final payment is currenUy in effect and will not be canceled <br />or allowed to expire until at least 3o days' prior written notice has been given to the Owner, (3) a <br />written statement that the Contrador knows of no substantial reason that the insurance will not <br />be renewable to cover the period required by the Contract Documents, (4) consent of surety, if any, <br />to final payment and (5), iF required by the Awner, other data establishing payment or <br />satisfaction of obligations, such as receipts, refeases and waivers of liens, claims, security interests <br />or encumbrances arising out of the Contract; to'the extent and in such form as may be <br />designated by the Ownes If a Subcontractor refuses to furnish a release or waiver required by the <br />Owner, the Contrador may fumish a bond satisfactory to the Owner to indemnify the Owner <br />against such lien. IF such lien remains unsatisfied aftet payments are made, the Contractor shall <br />refund to the Owner all money that the Owner may be compelled to pay in discharging such lien, <br />including all costs and reasonable attorneys' fees. <br />9.103 If, aRer Substantial Completion of the Wotk, final completion thereof is materially delayed <br />through no fault of the Contractor or by issuance of Change Orders affecting final completion, <br />and the Architect so confirms, the Owner shall, upon application by the Contractor and certifi- <br />cation by the Architect, and without terminating the Contract, make payment of the balance due <br />fa that portion of the Work fully completed and accepted. If the remaining balance for Work not <br />fully completed or corrected is less than retainage stipulated in the Contract Documents, and if <br />bonds have been furnished, the written consent of surety to payment of the balance due for that <br />WAItNING: Unlicensad photocopying vbletas U.S. copyright laws and will subJect the vlolator fo legal prosecuflon. <br />~ IIII o <br />a. o <br />00 ~.~o <br />~ <br />0 199] AIA4D <br />AIA DOCUMENT A201-1997 <br />GENERAI CONDITIONS <br />OF THE CONTRACT FOR <br />CONSTRUCTION <br />The American Institute <br />of Architects <br />1735 New York Avenue, N.W. <br />Washington, D.C. 20006-5292 <br />