My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-D Animal Shelter Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
08 - August
>
2002-08-12
>
05-D Animal Shelter Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:30:22 AM
Creation date
8/9/2002 9:03:58 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
RESOLUTION
Description
Award the bid and authorize the contract for the construction of the City of Paris Animal Shelter
AGENDA - Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall reimburse the Contractor by increasing the Contract Sum to pay the cost of purchasing and <br />maintaining such optional insurance coverage, and the Contractor shall not be responsible for <br />purchasing any other liability insurance on behalf of the Owner. The minimum limits of <br />liability purchased with such coverage shall be equal to the aggregate of the limits required for <br />Contractor's Liability Insurance under Clauses 11.1.1.2 through 11.1.1.5. <br />113.2 To the extent damages are covered by Project Management Protective Liability insurance, <br />the Owner, Contractor and Architect waive all rights against each other for damages, except such <br />rights as they may have to the proceeds of such insurance. The policy shall provide for such <br />waivers of subrogation by endorsement or othenvise. <br />173.3 The Owner shall not require the Contractor to indude the Owner, Architect or other <br />persons or entities as additional insureds on the Contrador's Liability Insurance coverage under <br />Paragraplt ti.i. <br />71.4 PROPERTY INSURANCE <br />11.4.7 Unless otherwise provided, the Owner shall purchase and maintain, in a company or <br />companies lawfully authorized to do business in the jurisdiction in which the Project is located, <br />property insurance written on a builder's risk "all-risk" or equivalent policy form in the amount <br />of the initial Contrad Sum, plus value of subsequent Contrad modificalions and cost of <br />materials supptied or installed by others, comprising total value Eor the entire Project at the site <br />on a replacement cost basis without optional deductibles. Such property insurance shall be <br />maintained, unless otherwise provided in the Contract Documents or otherwise agreed in writing <br />by all persons and entities who are beneficiazies of such insurance, until final paymeni has been <br />made as provided in Paragraph 9.io or until no person or entity other than the Owner has an <br />insurable interest in the property required by this Paragraph 11.4 to be covered, whichever is later. <br />This insurance shall indude interests of the Owner, the Contrador, Subcontractors and <br />Sub-subcontractorsin the Project. <br />11.4.7.1 Property insurance shall be on an "all-risk" or equivalent policy form and shall indude, <br />without limitation, insuiance against the perils of 6re (wiih extended coverage) and physical loss <br />or damage including, without duplication of coverage, theft, vandalism, malicious mischief, <br />co]lapse, earthquake, flood, windstorm, Falsework, testing and startup, temporary buildings and <br />debris removal including demolition occasioned by enforcement of any applicable legal <br />requirements, and shall cover reasonable compensation for Architect's and Contractor's services <br />and expenses required as a result of such insured loss. <br />11.4.1.2 If the Owner does not intend to purchase such property insurance required by the <br />Contract and with all of the coverages in the amount described above, the Owner shall so inform <br />the Contractor in writing prior to commencement of the Work. The Contrador may then effect <br />insurance which will protect the interests of the Contractor, Subcontractors and <br />Sub-subcontractors in the Work, and by appropriate Change Order the cost thereof shall be <br />charged to the Ownec If the Contractor is damaged by the failure or neglect of the Owner to <br />purchase or maintain insurance as described above, without so notifying the Contractor in ~~II <br />writing, then the Owner shall bear all reasonable costs properly attributable thereto. <br />o, a <br />17.4.1.3 If the property insurance requires deductibles, the Owner shall pay costs not covered °oo.oo° <br />because of such deductibles. <br />. . 01997 AIAO <br />AIA DOCUMENT A201-1997 <br />77.4.1.4 This property insurance shall cover portions of the Work stored off the site, and also GENERAL CONDITIONS <br />portions of the Work in transit. oF rHe corvrancr FoR <br />CONSTRUCTION <br />11.4.1.5 Partial occupancy or use in accordance with Paragraph 9.9 shall not commence until the rhe nmerican insrirure <br />insurance company or companies providing property insurance have consented to such partial of nrchirects <br />1735 New York Avenue, N.W. <br />Washington, D.C.20006-5292 <br />WARNING: Unlicensed plwtocopying violafes U.S. copyright laws and will subjecf ihe vloiatar fo legal prosecufion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.