My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-D Animal Shelter Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
08 - August
>
2002-08-12
>
05-D Animal Shelter Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 9:30:22 AM
Creation date
8/9/2002 9:03:58 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
RESOLUTION
Description
Award the bid and authorize the contract for the construction of the City of Paris Animal Shelter
AGENDA - Date
8/12/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br />SPSCIFICATION INDER <br />1. GENERAL RE4IIIREMLPNTS-------------------------- 1 THRU 8 <br />2. SITE WORR: 9 THRU 12 <br />2-A Excavation S Site Work---------"'--- 13 THRU 15 <br />2-g Miscellaneous Site Improvement--------' <br />3. CONCRETE TRORR: <br />3-A Concrete Form Work--------------------- <br />i~ THRU 19 <br />3-8 Concrete Reinforcement--------"---'-_ 20 THRU 24 <br />3-C Cast-in-Place Concrete--^--°-""---_ <br />4 . mII4SONRY : <br />5. STEEL------------------ <br />25 THRU 28 <br />29 <br />6• ~P~Ry' 30 THRU 31 <br />6-B Finished Carpentry----" <br />7. <br />MOI3TURE CONTROL: 32 <br />7-B Buildiag Insulation--------° - <br />TggU 33 <br />_ <br />34 <br /> <br />7-C Roofing 6 Sheetmetal----- <br />THRU 35 <br />36 <br />_ <br />7-D Caulking 6 Sealants--------""--- <br />8. <br />DOORS, qPINDOW3. AND GLASS: 3~ <br />Glass <br />THRU 38 <br />39 <br />8-A Metal Doora, Frames & <br /> <br />g-B ~Pood Doors-------" <br />40 <br />" " <br />THRU 41 <br />8-C Finishing Hardware----- <br />9. <br />FINISHES: 42 <br />- <br />THRU 44 <br />9-B Gypsum Dryvrall--------- <br />45 <br />THRU 47 <br />9-C Tile Work------------ <br />48 <br /> <br />THRU 49 <br />g-E Acousticsi Treatment------ <br />50 <br /> <br />THRU 51 <br />9-G Resilient Flooriag------- <br />52 <br /> <br />THRU 54 <br />9-H Painting------------ <br />55 <br /> <br /> <br />THRII 56 <br />9-1 Special Coat3ng-------- <br />57 <br />10. <br />SPECIAATIES-------------------- <br />---------------------58 <br />THRU 60 <br />11. <br />EQUIPDoNT:--------------- <br />15. MECHANICAI+: 61 THRU 67 <br />° <br />15-A Plumbing-----' <br />- 15-8 Heatinq 6 Air Conditioning------------- 68 THRU 72 <br />16. LLECTRICAL------------------------------------ 73 THRU 75 <br />17. AIA A201 GENERAI+ CONDITIONS OF CONTRACT------- 7fi THRU <br />
The URL can be used to link to this page
Your browser does not support the video tag.