My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 3rd Street Public Hearing
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
10 - October
>
2002-10-10
>
09 3rd Street Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:25:25 AM
Creation date
10/4/2002 6:43:31 PM
Metadata
Fields
Template:
AGENDA
Item Number
9
AGENDA - Type
PUBLIC HEARING
Description
3rd Street Closing
AGENDA - Date
10/10/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hydro Conduit Division <br />1569 S.. Churr. h Street <br />PaS° Texas 75460 <br />Phone 903-784-8652 <br />Fax 903-785-2899 <br /> <br />June 12, 2002 <br /> <br />lqk. Larry Schenk <br />City Attorney <br />City of Paris, Texas <br />125 SE 1 St. 75460 <br /> <br />Subject: SE 3~ Street closing. <br /> <br />Dear Ivir. Schenlq <br /> <br /> · o E 3'a Street from north <br />Hydro Conduit Corp. of Texas L?, request the closmo of S <br />boundary line of Paris Blvd. to south boundary line.of Sycamore St.. <br />This request ~s for the portton of SE 3 that lies within the Industrial Campus of <br />our Paris Pipe Plant. We have maintained the street as i fit were part of our <br />property for the last few years. It has not received any attention from the City of <br />Paris in many years. We own all property around subject, with the exception of <br />Blankinship Oil on northwest side. See letter attached stating their support for <br />closing with no desire for part of the street. <br /> With our interest on Safety, the street has been identified as a major hazard with <br /> industrial equipment and trucks crossing from one side to the other on a regular <br /> basses. Another safety hazard are children coming onto our property, playing on <br /> the concrete pipe and eqnipment. With the closing, we will be able to enclose our <br /> plant site with a chain-link fence eliminating these safety concerns. <br /> Hydro agrees to pay the City of?aris the appraised value for the propei'ty. <br />:'~Ve respectfully request your prompt attention to the mater· If we can be of any <br />~ervice to you, please advise. <br /> <br />Sincerely, <br /> <br />Donald Wall <br />Sr. Account Mgr. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.