My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18 2900 Pine Bluff Final Plat
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
10 - October
>
2002-10-10
>
18 2900 Pine Bluff Final Plat
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:10 AM
Creation date
10/3/2002 7:05:23 PM
Metadata
Fields
Template:
AGENDA
Item Number
18
AGENDA - Type
MISCELLANEOUS
Description
Lots 14-A through 14-F, Block 259 Final Plat
AGENDA - Date
10/10/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> <br />TO: <br /> <br />Mayor and City Council <br />Planning and Zoning Commission <br /> <br />FROM: <br /> <br />Shawn Napier, P.E. <br />City Engineer <br /> <br />DATE: <br /> <br />October 1, 2002 <br /> <br />. S.~BJECT: Final Plat of City Block 259, Lots 14 A through F <br /> <br /> I have reviewed the final plat of the above referenced addition. It appears that the plat complies <br /> with the City of Paris subdivision regulations with the following exceptions and/or additions. <br /> <br />Label the finished floor elevations on each lot. <br />The title block in the top left comer needs to show the total acreage to be divided <br />and 31st St. should be changed to 30th St. <br />The lots shall be numbered 14 and ordered using letters B through F accordingly <br />(i.e. 14B, 14C, etc.). All references in the field notes must be changed to match <br />the new lot designation. <br />In the field notes in paragraph five, change 30th N.W. to 30th N.E. <br />The sewer line shall be constructed prior to acceptance of the final plat or a <br />Guarantee of Construction shall be completed in the amount of $11,500.00 per <br />Ordinance No. 1315 Section xm. Guarantee of Construction. <br />A one-year maintenance bond is required after completion of all infrastructure <br />improvements per Ordinance No. 1315 Section IV (11) or Section XIlI. <br /> <br />I recommend approval of the preliminary plat upon completion of the above items. <br /> <br /> Sincerely, <br />~hawn'NaP[¢r,~.E. <br /> City Engineer <br /> <br />CCi <br /> <br />Michael E. Malone, City Manager <br />Larry W. Schenk, City Attorney <br />Steve Methven, Building Official <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.