My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07 The Hills Phase III Fnl Plt
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2002
>
11 - November
>
2002-11-07
>
07 The Hills Phase III Fnl Plt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 8:25:43 AM
Creation date
11/1/2002 7:03:14 PM
Metadata
Fields
Template:
AGENDA
Item Number
7
AGENDA - Type
MISCELLANEOUS
Description
Final Plat - The Hills, Phase III
AGENDA - Date
11/7/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />TO: Mayor and City Council <br />Planning and Zoning Commission <br />FROM: Shawn Napier, P.E., City Engineer <br />DATE: November 1, 2002 <br />SUBJECT: The Hills Phase III Final Plat <br />I have reviewed the plat of the above referenced addition. It appears that the plat complies with <br />the City of Paris subdivision regulations with the following exceptions and/or additions. <br />1. Owners must sign plat. <br />2. Provide a certificate that all taxes and fees have been paid and a$25.00 <br />filing fee. <br />3. Include "West" in the next to last call in the field notes, before the <br />distance (201.00). <br />4. Type out the full title on the easement between lots 5 and 6 on block E <br />(10' drainage and utility easement). <br />5. Add a 10' utility easement between lots 16 and 17 of block D. <br />6. Change the finished floor elevation on lot 8 of block E from 557.2 to <br />537.2 to match the grading and drainage plan. <br />7. Add "ROW" (Right-of-Way) to all the dimensions showing street Right- <br />of-Way. Add a width on Abby Lane just East of North Hills Drive. <br />8. Show the 5'utility easement around the ROW. <br />9. 3ubmit an As-Built Drawing to the Engineering Department. <br />10. Have the Utility Companies notify the City oF Paris Engineering <br />Department 72 hours prior to installing utilities at (903) 784-9234. <br />11. A certificate of Guazantee of workmanship and materials used in <br />construction and installation of water lines, sewer lines and streets for a <br />period of 1-year is required in accordance to The Code of Ordinance No. <br />1315, Section N, item 11. <br />I recommend approval of the plat upon completion of the above items. <br />Sincerely, <br />~ _ <br />awn Napi , P.E. <br />City Engineer <br />cc: Michael E. Malone, City Manager <br />Larry W. Schenk, City Attorney <br />Steve Methven, Building Official <br />
The URL can be used to link to this page
Your browser does not support the video tag.