My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-W Addn 1 - Water Dist Study
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
01 - January
>
2003-01-13
>
07-W Addn 1 - Water Dist Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:56 AM
Creation date
1/9/2003 8:16:38 PM
Metadata
Fields
Template:
AGENDA
Item Number
7-W
AGENDA - Type
RESOLUTION
Description
Addendum 1 for water distribution system improvements
AGENDA - Date
1/13/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> <br />F:ALICEkRESWORK\CURRENT\eLEV Water Storage-Water Lines Addendum to Bucher Willis Contr Res <br /> December 4, 2002 <br /> <br />RESOLUTION NO. <br /> <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, <br />PARIS, TEXAS, APPROVING ADDENDUM NO. ONE TO THE <br />AGREEMENT FOR ENGINEERING SERVICES WITH BUCHER WILLIS <br />& RATLIFF CORPORATION FOR WATER DISTRIBUTION SYSTEM <br />IMPROVEMENTS INCLUDING WATER TRANSMISSION LINES, WATER <br />STORAGE FACILITIES AND SYSTEM ANALYSIS STUDIES; MAKING <br />OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND <br />DECLARING AN EFFECTIVE DATE. <br /> <br /> WHEREAS, the City Council of the City of Paris did heretofore, on the 1 lth day of <br />February, 2002, in Resolution No. 2002-043, approve the execution of an Agreement for <br />Engineering Services with Bucher Willis & Ratliff Corporation for water distribution system <br />improvements including water transmission lines, water storage facilities, and system analysis <br />studies; and, <br /> <br /> WHEREAS, as a result of said engineering services, the City sought competitive bids <br />for the construction of a new water tank and awarded said contract to the lowest responsible <br />bidder in compliance with State law; and, <br /> <br /> WHEREAS, Article II, paragraph 2c of the aforesaid Engineering Services Agreement <br />provides the City the opportunity, at its option, to contract with the consultant to provide on-site <br />construction representation during construction of both the new water tank and the associated <br />water lines; and, <br /> <br /> WHEREAS, the City desires to obtain such additional on-site construction representation <br />services from Bucher Willis & Ratliff, and it is deemed appropriate that the terms of the original <br />Agreement for Engineering Services be revised by the addition of these services in an <br />appropriate Addendum; and, <br /> <br /> WHEREAS, the form of Addendum No. One to the original Agreement for Engineering <br />Services, attached hereto as Exhibit A, should, in all things, be approved, and the City Manager <br />should be authorized to execute the same; NOW, THEREFORE, <br /> <br /> BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, <br />TEXAS: <br /> <br /> Section 1. That the findings set out in the preamble to this resolution are hereby in all <br />things approved. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.