My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-W Addn 1 - Water Dist Study
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
01 - January
>
2003-01-13
>
07-W Addn 1 - Water Dist Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:56 AM
Creation date
1/9/2003 8:16:38 PM
Metadata
Fields
Template:
AGENDA
Item Number
7-W
AGENDA - Type
RESOLUTION
Description
Addendum 1 for water distribution system improvements
AGENDA - Date
1/13/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 8, 2003 <br /> <br />Mr. Shawn Napier, City Engineer <br />City of Paris <br />P.O. Box 9037 <br />Paris, TX 75461-9037 <br /> <br />Re: Addendum No.1 to the Agreement for Engineering Services <br /> Water System Improvements <br /> <br />Dear Mr. Napier: <br /> <br />Bucher, Willis and Ratliff Corporation (BWR) is requesting that Addendum No. 1 to the Engineering <br />Services Agreement between the City of Paris and BWR be approved by the Paris City Council. This <br />Addendum provides for construction observation and material testing of the Elevated Water Storage <br />Facility and the 24" RCCP Water Transmission Line. Procedures will include the following: <br /> <br />Elevated Water Storage Facility: Field observation of foundation reinforcing steel <br /> Field observation of support column reinforcing steel <br /> Testing of concrete in the foundation and column <br /> Field observation of steel preparation <br /> Field observation of welding during tank construction <br /> Field x-rays of joint welds <br /> Field observation of steel preparation for coating application <br /> Field observation of coating application <br /> Field testing of coating thickness as per specifications <br /> <br />Water Transmission Line: Collection of soils samples and lab testing of material <br /> Field analysis of lime stabilization materials and soils <br /> Field density and moisture testing of compacted materials <br /> <br />The estimated cost of performing these procedures, including administrative and subcontractor costs, is <br />$89,981.00. Services associated with this Addendum will be based on an hourly cost basis for all items. <br />It is requested that a budget of $90,000.00 be approved as a part of Addendum No. I to cover the costs of <br />these tasks. If you are in agreement with the terms listed, please sign and return one copy for our records. <br /> <br />Very truly yours, <br />BUCHER, WILLIS & RATLIFF CORPORATION CITY OF PARIS, TEXAS <br /> <br />Kevin D. Newman, P.E. Michael E Malone <br />Principal/Executive Vice President City Manager <br />KDN:ma EXHIBIT A <br /> <br /> ENGINEERS I PLANNERS I ARCHITECTS <br /> <br /> ( ( <br /> 001 SH£Lt£Y DRIVt, SUIf£ 202 I T'~tH~, TIXAS 75701 )41 ) I PH~Nt: 90~o581 ,7844 I F^x: 903o581 '"0178 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.