Laserfiche WebLink
MEMORANDUM <br /> <br />TO: <br /> <br />Mayor and City Council <br /> <br />FROM: <br /> <br />Shawn Napier, P.E. <br />City Engineer <br /> <br />DATE: <br /> <br />February 26, 2003 <br /> <br />SUBJECT: Proposed Roadway Projects <br /> <br />The Texas Department of Transportation (TXDOT) has asked that the City of Paris submit a list <br />of projects we would like TXDOT to consider constructing. The project list will be forwarded <br />with other cities and counties request for possible selection. If the project is selected it will be <br />placed on a letting schedule. The preliminary list below is for addition, subtraction and ranking. <br /> <br />· Grade separation (overpass) at Pine Mill and Loop 286 <br />· Grade separation at Collegiate and Loop 286 <br />· Grade separation at 19th S.W. (F.M. 137) and Loop 286 <br />· Add a turn lane for north bound traffic on 20th St. N.E. (F.M. 195) to turn onto Pine Bluff <br /> and construct a signal light at Pine Bluff and 20th St. N.E. (F.M. 195) <br />· Widen 19th N.W. (F.M. 79) to include a center turn lane from Bonham St. to Loop 286 <br />· Widen Lamar Ave. to include a center turn lane from 20th N.E. (F.M. 195) to Collegiate <br />· Widen Pine Mill Road from Loop 286 to Reno to a Collector level street (39 feet back to <br /> back width) <br />· Widen Collegiate from Jefferson Road (F.M. 1508) to Loop 286 to a Collector level <br /> street (39 feet back to back width) <br />· Widen 1st St. N.W. and construct a cross over to North Main at MLK in order to make it <br /> one-way for south bound traffic and convert North Main to a one-way street for north <br /> bound traffic from Graham St. to MLK <br />· Add a outer loop from Lamar Ave. (U. S. 82 East) to N. Main (U. S. 271 North) <br /> <br />CC~ <br /> <br />Michael E. Malone, City Manager <br />Larry W. Schenk, City Attorney <br />Terry Townsend, Director of Public Works <br /> <br /> <br />