My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-G Water&Sewer (2/18/03)
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
04 - April
>
2003-04-14
>
03-G Water&Sewer (2/18/03)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:21:53 AM
Creation date
4/10/2003 9:58:21 PM
Metadata
Fields
Template:
AGENDA
Item Number
3-G
AGENDA - Type
MINUTES
Description
City Council Water & Sewer Subcommittee
AGENDA - Date
2/18/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL MEETING OF THE CITY COUNCIL WATER & SEWER <br />SUBCOMMITTEE <br /> February 18, 2003 <br /> <br />The City Council Water and Sewer Subcommittee met in special session, <br />Tuesday, February 18, 2003, at 6:00 P. M., in the City Hall West Annex <br />Conference Room, 150 1 st SE, Paris, Texas. Chairman Benny Plata called the <br />meeting to order with Councilwoman Francine Neeley being present. Also <br />present were City Manager Michael E. Malone, City Attorney Larry Schenk, <br />Director of Finance Gene Anderson, Director of Utilities Herb Campbell, <br />Director of Public Works Terry Townsend, and City Clerk Mattie Cunningham. <br /> <br />Others in attendance were Charles Waldrum, Steve Pearson, and Zane Hanna <br />representing Tenaska, Jay Guest, Jim Bell, and Don Wilson ,citizens, Marilyn <br />Davidson representing Sara Lee, and Richard Quarles and Bob Johns <br />representing Campbell Soup. <br /> <br />Chairman Plata announced that Herb Campbell, Director of Utilities, had <br />produced a handout with information on the city's water and sewer system and <br />asked Mr. Campbell for an explanation regarding the handout. <br /> <br />Mr. Campbell said that page one of the handout is a 1987 process flow diagram <br />of the City of Paris's Water Treatment Plant. He said that page two is a flow <br />diagram showing it as it is today. Mr. Campbell pointed out that everything in <br />red on page two has been added since 1987. He pointed out that four filters <br />had been added which are large items along with two large basins, and a new <br />rapid mix streaming current monitor. Mr. Johns asked if land had been <br />purchased. Mr. Campbell replied that land was purchased for the spray fields. <br />Mr. Campbell said that mainly these expansions were done in order to meet the <br />water quality standards, and the expansion was above and beyond that because <br />once they met a certain level, then there was the next level that the city could go <br />to, which would be a lot cheaper and that is where the city is at this time. Mr. <br />Campbell directed attention to the top of the page so that everyone would see <br />facilities which serve Lamar Power Partners, showing pumps, lagoon, meter and <br />control valves. He stated that this equipment is all new. Mr. Campbell <br />explained that the water comes in from the lake and goes into the lagoon and <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.