Laserfiche WebLink
* Note: Costs are preliminary estimates only and prepared without the benefit of detailed engineering. All costs <br />shown are based on 2010 dollars and do not include fees associated with planning, engineering and /or architectural <br />work that may be required. Final construction costs will vary. Land acquisition is not included in the cost estimate. <br />P <br />City of Paris Parks, Recreation & Open Space Master Plan 2013 -2023 <br />Page 40 <br />Project <br />Date <br />Estimated <br />Cost* <br />Potential Funding <br />Source <br />9 <br />Prepare Master Plan for Lake Crook <br />2022 <br />N/A <br />Partnerships <br />Park <br />Private Donations <br />General Fund <br />General Obligation Bond <br />10 <br />Develop trail linkages <br />2013- <br />$250,000 <br />TPWD Grant (Trail <br />2023 <br />- <br />Grant) <br />$550,000 <br />TxDOT Enhancement <br />per mile <br />Partnerships <br />Private Donations <br />General Fund <br />General Obli ation Bond <br />* Note: Costs are preliminary estimates only and prepared without the benefit of detailed engineering. All costs <br />shown are based on 2010 dollars and do not include fees associated with planning, engineering and /or architectural <br />work that may be required. Final construction costs will vary. Land acquisition is not included in the cost estimate. <br />P <br />City of Paris Parks, Recreation & Open Space Master Plan 2013 -2023 <br />Page 40 <br />