My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-B Asbestos Abatement Bid
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
05 - May
>
2003-05-12
>
04-B Asbestos Abatement Bid
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:23:45 AM
Creation date
5/9/2003 8:38:07 PM
Metadata
Fields
Template:
AGENDA
Item Number
4-B
AGENDA - Type
RESOLUTION
Description
Award Asbestos Abatement Bid at UARCO Bldg & City Hall/Old Central Fire Station
AGENDA - Date
5/12/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERI Consulting, Inc. <br /> <br /> 4.5.1 Laboratory utilized for analyzing air samples by NIOSH 7400 (PCM) <br /> shall be satisfactory participants in the NIOSH Proficiency <br /> P. nalytical Testing (PAT) program. <br /> <br /> 4.5.2 Laboratories analyzing by pLM for bulk material identification shall <br /> be accredited by the NV-hAP program for NIST. <br /> <br /> 4.5.3 Laboratories analyzing air samples by TEM clearance shall be <br /> accredited for TEM analysis by the NVLAP program of NIST. <br /> <br /> 4.5.4 The period of time permitted between the collection of air samples <br /> and the availability of results shall be less than 24 hours for <br /> samples collected during abatement activities. Time tables for <br /> results of pre-abatement and clearance air samples shall be <br /> established by the Owner's Representative. <br /> <br /> 4.5.5 Air samples which are taken by or at the direction of the Owner's <br /> Representative will be analyzed at the laboratory specified by him. <br /> <br /> 4.5.6 After January 1, 1993 laboratories located in Texas must be licensed <br /> by the Texas Department of Health (see Scope of Work). <br /> <br />The specific procedures described in the Scope of Work take precedence over any <br />other part of the Specifications in Section 1.2 through 4.5 inclusive, except <br />that, requirements of the applicable regulations, if more stringent, shall be <br />followed. <br /> <br /> 4/11/03 77 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.