Laserfiche WebLink
ERI Consulting, Inc. <br /> <br /> PROPOSAL <br /> <br />TO: The City of Paris, Texas <br /> <br />1. The undersigned bidder proposes to furnish all labor, material and other items for the project, <br /> "Asbestos Abatement 2003 - UARCO Building and City Hall/Old Fire Station Building, <br /> Pads, Texas" in accordance with the Specifications as prepared by ERI Consulting, Inc., <br /> consultant for the project. <br /> <br />2a. UARCO Building: Our Lump Sum Price for the asbestos abatement, in accordance with <br /> Specifications, is as follows: <br /> Dollars ($ ). Total Bid <br /> <br />2b. City Hall/Old Fire Station Building: Our Lump Sum Price for the asbestos abatement, in <br /> accordance with Specifications, is as follows: <br /> Dollars ($ ). Total Bid <br /> <br />2c. Total Lump Sum Price for the asbestos abatement, (2a + 2b) in accordance with <br /> Specifications, is as follows: <br /> Dollars ($ ). Total Bid <br /> <br />3. The project duration will be: City Hall - 2 days. UARCOBuilding- 16days. <br /> <br />4. The undersigned bidder acknowledges receipt of addenda as follows (If none received, write <br /> none): <br /> <br />5. A Bid Bond, Cashier's Certified Check, payable to the in the amount of five <br /> percent (5%) of the highest possible bid is enclosed. <br /> <br /> Bidder <br /> <br /> Authorized Signature/Title <br /> <br /> Address <br /> <br /> Telephone Number <br /> <br /> <br />