My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-B Asbestos Abatement Bid
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
05 - May
>
2003-05-12
>
04-B Asbestos Abatement Bid
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:23:45 AM
Creation date
5/9/2003 8:38:07 PM
Metadata
Fields
Template:
AGENDA
Item Number
4-B
AGENDA - Type
RESOLUTION
Description
Award Asbestos Abatement Bid at UARCO Bldg & City Hall/Old Central Fire Station
AGENDA - Date
5/12/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERI Consulting, Inc. <br /> <br />Page 1 of 2 <br /> CONTRACTOR AGREEMENT <br /> <br />This Agreement made the __ day of in the year 20 , by and between <br /> <br /> , , hereinat~er called the Contractor, and The City of Paris, hereinafter called the <br />Owner, <br /> <br /> WITNESSETH, that the Contractor and the Owner for the consideration hereinafter named agree <br /> <br />as follows: <br /> <br /> ARTICLE 1. SCOPE OF WORK: The Contractor shall furnish all of the materials and perform <br />all of the work shown on the drawings and described in the specifications entitled "Asbestos Abatement ~ ' <br />UARCO Building and City Hall/Old Fire Station Building, Pads, Texas," prepared by ERI Consulting, <br />Inc., Consultant for the Owner, acting as and in these Contract Documents entitled the Consultant and <br />shall do everything required by this Agreement, the General Conditions of the Contract, the Supplemental <br />General Conditions, Special Conditions, Addenda, the Specifications, and the Drawings. <br /> <br /> The following is enumeration of the Specifications, Drawings, and Project Manual: <br />SPECIFICATIONS: <br /> <br /> I. Attachments <br /> <br /> II. Contract Conditions <br /> General <br /> Supplemental <br /> Special <br /> <br /> III. Technical Specifications <br /> Part 1 General <br /> <br /> Part 2 Materials and Equipment <br /> <br /> Part 3 Execution <br /> <br /> Part 4 Support Activities and Personnel <br /> <br />HOLD HARMLESS AGREEMENT: Attached <br /> <br />DRAWINGS: 1.1 <br /> <br />Work to be accomplished is enumerated for the areas covered under this contract in Sections 1.1 of the <br />Scope of Work. <br /> <br />ALTERNATES: The following Alternates, fully described in the Specifications are included as a part <br />of this Contract: NONE <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.