Laserfiche WebLink
ERI Consulting, Inc. <br /> <br />Page I of 2 <br /> CONTRACTOR AGREEMENT <br /> <br />This Agreement made the __ day of. in the year 20 , by and between <br /> <br /> , . hereinafter called the Contractor, and The City of Paris, hereinafter called the <br />Owner, <br /> <br /> '9,qTNESSETH, that the Contractor and the Owner for the consideration hereinafter named agree <br /> <br />as follows: <br /> <br /> ARTICLE 1. SCOPE OF WORK: The Contractor shall furnish all of the materials and perform <br />all of the v,'ork shown on the drawings and described in the specifications entitled "Asbestos Abatement - <br />UARCO Building and City Hall/Old Fire Station Building, Paris, Texas," prepared by ERI Consulting, <br />Inc., Consultant for the O~vner, acting as and in these Contract Documents entitled the Consultant and <br />shall do everything required by this Agreement, the General Conditions of the Contract, the Supplemental <br />General Conditions, Special Conditions, Addenda, the Specifications, and the Drax~Sngs. <br /> <br /> The following is enumeration of the Specifications, Drawings, and Project Manual: <br />SPECIFICATIONS: <br /> <br /> I. Attachments <br /> <br /> II. Contract Conditions <br /> General <br /> Supplemental <br /> Special <br /> <br /> III. Technical Specifications <br /> Part 1 General <br /> <br /> Part 2 Materials and Equipment <br /> <br /> Part 3 Execution <br /> <br /> Part 4 Support Activities and Personnel <br /> <br /> HOLD HARMLESS AGREEMENT: Attached <br /> <br /> DRAWINGS: 1.1 <br /> Work to be accomplished is enumerated for the areas covered under this c°ntract in Secti°ns 1.1 ofthe <br /> Scope of Work. <br /> ALTERNATES: The following Alternates, fully described in the Specifications are included as a part <br /> of this Contract: NONE <br /> <br /> EXHIBIT <br /> <br /> <br />