My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-B Asbestos Abatement Bid
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
05 - May
>
2003-05-12
>
04-B Asbestos Abatement Bid
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:23:45 AM
Creation date
5/9/2003 8:38:07 PM
Metadata
Fields
Template:
AGENDA
Item Number
4-B
AGENDA - Type
RESOLUTION
Description
Award Asbestos Abatement Bid at UARCO Bldg & City Hall/Old Central Fire Station
AGENDA - Date
5/12/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERI Consulting, Inc. <br /> <br /> data and all other information required by the Owner' s <br /> <br /> Representative to evaluate the proposed substitution. <br /> <br /> 2.3.1.3 Do not substitute materials, equipment or methods unless such <br />-' substitution has been specifically approved for this work by <br /> <br /> the Owner's Representative. <br /> <br />-- 2.3.2 "Or equal": <br /> <br /> 2.3.2.1 Where the phrase "or equal" or "or equal as approved by the <br /> Owner" occurs in the Contract Document, do not assume that <br /> materials, equipment or methods will be approved by the <br /> Owner's Representative unless the item has been specifically <br /> approved for this work by the Owner's Representative. <br /> <br /> 2.3.2.2 The decision of the Owner's Representative shall be final. <br /> 2.3.3 Separate substitute bids: <br /> <br /> 2.3.3.1 Bidders may, if they wish, submit completely separate bids <br /> using materials and methods other than those described in the <br /> <br />-' Contract Documents, provided that all substitutions are <br /> clearly identified and described, and that the Bid in all <br /> other respects is in accordance with the provisions of the <br /> Contract Documents. <br /> <br /> 2.3.4 Availability of specified items: <br /> <br /> 2.3.4.1 Verify prior to bidding that all specified items will be <br /> available in time for installation during orderly and timely <br /> progress of the work. <br /> <br /> 2.3.4.2 In the event that specified items will not be so available, <br /> notify the Owner's Representative prior to receipt of bids. <br /> <br /> 2.3.4.3 Costs of delays because of non-availability of specified <br /> items, when such delays could have been avoided by the <br /> Contractor, will be back-charged as necessary and shall not be <br /> borne by the Owner. <br /> <br /> Part 3 - Execution <br /> <br /> 3.1 Preparation <br /> <br /> 3.1.1 Work Areas <br /> <br /> 3.1.1.1 Post danger signs meeting the specifications of OSHA 29 CFR <br /> 1926.1101 (k) (1) at any location and approaches to a location <br /> where airborne concentrations of asbestos may exceed the PEL. <br /> signs shall be posted at a distance sufficiently far enough <br /> away from the work area to permit an employee to read the sign <br /> and take the necessary protective measures to avoid exposure. <br /> Additional signs may need to be posted following construction <br /> of workplace enclosure barriers. Barrier tape will be <br /> <br /> 4/11/03 56 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.