My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-F Water/Sewer (5/15/03)
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
06 - June
>
2003-06-09
>
03-F Water/Sewer (5/15/03)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:21:36 AM
Creation date
6/9/2003 3:25:48 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council W~er & Sewer Subcommi~ee <br />May15,2003 <br />Page 12 <br /> <br />years to meet increasing regulatory responsibilities and to operate a greatly <br />expanded operation with more equipment and more tasks to be performed. He <br />said that, while the duties have greatly expanded in the past ten years, no <br />additional personnel have been added. <br /> <br />City Manager Malone advised that the number one reason for having a <br />minimum of two people manning the water production plant each shift is for <br />the health and safety of the public who consumes the water produced and, <br />equally important, to maintain the health and safety of our employees. A <br />secondary reason would be to provide an extra measure of protection for the <br />assets of the water treatment plant to prevent damage to the facility. <br /> <br />City Manager Malone advised that on one occasion, when he served on the City <br />Council, the only operator at the water plant fell asleep one night and failed to <br />turn off pumps which compounded the error of leaving the bonnet off of one of <br />the high service pumps being repaired. He said that this flooded the water <br />plant and put the plant out of production for several days. City Manager <br />Malone noted that the electric motors had to be pulled from the pumps and <br />shipped to Fort Worth, Texas, to be dried out at a cost of approximately half a <br />million dollars. He said that fortunately, at the time, the old Camp Maxey <br />water treatment plant could produce some water for the citizens, but industry <br />was curtailed and the situation was expensive for all concerned. There was a <br />lot of lost production in Paris and great danger to the public safety because of <br />this simple error. <br /> <br />City Manager Malone said on another occasion, the only operator on duty <br />slipped and fell approximately ten feet off the end of the filter deck and lay <br />unattended for some unknown time before he recovered and resumed his <br />duties. These two actual occurrences, he believed, effectively demonstrate the <br />need for two persons to be on duty at both plants during each shift. <br /> <br />City Manager Malone attached additional information to his memorandum. He <br />said that Mr. Campbell is present to discuss in detail why major staff <br />reductions are not advisable. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.