City Council Water & Sewer Subcommittee <br />May 15, 2003 <br />Page 3 <br /> <br />availability of a substitute from another city department was unknown. The <br />City Manager pointed out from an attachment of a memorandum from Mr. <br />Campbell dated April 23, 2003, which explains that the vehicle to be replaced <br />was towed to the city shop on November 22, 2002, in an inoperable condition. <br />Documentation is also attached concerning the condition of that vehicle and the <br />recommendation of the shop that the vehicle be disposed of rather than being <br />repaired. Mr. Campbell's memorandum also explains that on January 7, 2003, <br />Public Works was able to transfer a vehicle to the Utilities Department to <br />replace Unit 217, which subsequently has been placed in the city surplus <br />auction, thus the one-time cost of $13,000.00 has already been achieved. The <br />replacement vehicle was a 1990 GMC S- 15 pickup, which had been previously <br />used by Animal Control and by Maria Pope who did work for Public Works. <br />This vehicle is in fair condition and has 114,792 miles on it. Also attached to <br />City Manager Malone's memorandum is a repair estimate made by James <br />Walker, Shop Supervisor, stating that the vehicle would not start, the engine <br />would have to be rebuilt at a cost of $3,095.22, and recommending disposal of <br />the vehicle, and the transfer document moving the 1990 GMC Pickup to the <br />Water Treatment Division. <br /> <br />City Manager Malone passed out a memorandum for Councilman Plata's <br />Recommendation Number Two: ~ Eliminate $40,000.00 budgeted for <br />equipment to remove sludge when conventional methods have worked for <br />years". <br /> <br />City Manager Malone said on pages four and five of the minutes of the Special <br />City Council Meeting of September 19, 2002, attached to this memorandum, <br />beginning with the fourth paragraph, Councilman Plata questioned the <br />proposed expenditures of $40,000.00 in line item 10-0414-82-00, Other, sludge <br />removal. These minutes were from a budget workshop last year, prior to the <br />passage of the budget as follows: ~Mr. Campbell explained that the water <br />treatment plant sludge is collected into two settlement basins from what was <br />the Maxey Water Treatment Plant. He said that we cannot get the sludge out <br />of these basins fast enough and that funds from this line item were budgeted to <br />install automatic sludge handling equipment in the bottom of these two basins. <br /> <br /> <br />